BSL
BSL is a renovation/alteration project at 13929 Center Lake Dr., Bldg. 4.1, Suite 300, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $6.2M across about 58,716 sq ft.
๐Project Metrics
TDLR #TABS2022010139Review Complete
Design review complete, construction may proceed
BSL is a Renovation/Alteration project located at 13929 Center Lake Dr., Bldg. 4.1, Suite 300, Austin, TX 78753 in Austin, Texas. The project has an estimated value of $6.2M covering 58,716 sq ft. Trammell Crow Company is the property owner and Perkins&Will is the design firm of record. The project was registered with TDLR on January 25, 2022.
โFrequently Asked Questions
What is BSL?
BSL is a renovation/alteration project at 13929 Center Lake Dr., Bldg. 4.1, Suite 300 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: First generation, full floor interior build-out of Level 3 in a three-story office building.
Is BSL open in Austin?
BSL is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is BSL located?
BSL is located at 13929 Center Lake Dr., Bldg. 4.1, Suite 300, Austin, TX, 78753, in Travis County.
Who is the owner or developer of BSL?
Trammell Crow Company is the property owner/developer of record for BSL, per its TDLR project registration.
Who is the architect or design firm for BSL?
Perkins&Will is the design firm of record for BSL, according to its TDLR filing.
How much does BSL cost and how big is it?
BSL has an estimated construction value of $6.2M and approximately 58,716 square feet (about $106/sqft), based on its TDLR filing.
๐Scope of Work
First generation, full floor interior build-out of Level 3 in a three-story office building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 25, 2022
Review Complete
Jan 25, 2022
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$1.28B total๐๏ธSame Design Firm
$8.48B total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work kirk
Tata TCS Sign A
New generator and generator enclosure on existing parking lot.
Replacement of an existing water heater
Add new 4 Mini-Splits associated electrical work to wire mini-splits and roof work for Building 4.1 & Building 4.2