Project intelligenceTDLR TABS2022010585Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

8th Street Extension

1600 Block 8th Street, Seguin, TX, 78155

Construction complete · Dec 2022Project Closed

8th Street Extension is a renovation/alteration project at 1600 Block 8th Street, Seguin, in Guadalupe County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2022). The project has an estimated value of $1.0M across about 150,000 sq ft.

Estimated project value
$1.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
150,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$7/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 31, 2022304 days across supplied datesDec 1, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    90 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    214 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78155 (Seguin)

One email per change. Unsubscribe in one click. Privacy.

8th Street Extension is a Renovation/Alteration project located at 1600 Block 8th Street, Seguin, TX 78155 in Seguin, Texas. The project has an estimated value of $1.0M covering 150,000 sq ft. Melissa Reynolds is the property owner and Pape-Dawson Engineers is the design firm of record. The project was registered with TDLR on January 31, 2022.

Frequently Asked Questions

What is 8th Street Extension?

8th Street Extension is a renovation/alteration project at 1600 Block 8th Street in Seguin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Roadway improvements and construction of associated drainage channels, culvert, and storm drain. Realignment of water main, sanitary sewer modifications, and installation of water and sewer services.

Is 8th Street Extension open in Seguin?

Construction on 8th Street Extension is complete — TDLR records show the project passed its required accessibility inspection in Dec 2022. The building is finished and very likely open.

Where is 8th Street Extension located?

8th Street Extension is located at 1600 Block 8th Street, Seguin, TX, 78155, in Guadalupe County.

Who is the owner or developer of 8th Street Extension?

Melissa Reynolds is the property owner/developer of record for 8th Street Extension, per its TDLR project registration.

Who is the architect or design firm for 8th Street Extension?

Pape-Dawson Engineers is the design firm of record for 8th Street Extension, according to its TDLR filing.

How much does 8th Street Extension cost and how big is it?

8th Street Extension has an estimated construction value of $1.0M and approximately 150,000 square feet (about $7/sqft), based on its TDLR filing.

Scope of Work

Roadway improvements and construction of associated drainage channels, culvert, and storm drain. Realignment of water main, sanitary sewer modifications, and installation of water and sewer services.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Watch all construction in 78155 (Seguin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Guadalupe

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists