Project intelligenceTDLR TABS2022010835New Construction
Funding type

This project is privately funded, on private land for private use.

Lilyana Phase 5 in Celina, TX

Lot 5X, Block X, Lantana Lane, Celina, TX, 75009

Construction complete · Nov 2023Project Closed

Lilyana Phase 5 is a new construction project at Lot 5X, Block X, Lantana Lane, Celina, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2023). The project has an estimated value of $1.4M across about 107,000 sq ft.

Estimated project value
$1.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
107,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$13/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 2, 2022637 days across supplied datesNov 1, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    58 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    579 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75009 (Celina)

One email per change. Unsubscribe in one click. Privacy.

Lilyana Phase 5 is a New Construction project located at Lot 5X, Block X, Lantana Lane, Celina, TX 75009 in Celina, Texas. The project has an estimated value of $1.4M covering 107,000 sq ft. First Service Residencial is the property owner and Garthoff Design is the design firm of record. The project was registered with TDLR on February 2, 2022.

Frequently Asked Questions

What is Lilyana Phase 5?

Lilyana Phase 5 is a new construction project at Lot 5X, Block X, Lantana Lane in Celina, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction amenity center including restroom building, pool facilities and outdoor recreation areas.

Is Lilyana Phase 5 open in Celina?

Construction on Lilyana Phase 5 is complete — TDLR records show the project passed its required accessibility inspection in Nov 2023. The building is finished and very likely open.

Where is Lilyana Phase 5 located?

Lilyana Phase 5 is located at Lot 5X, Block X, Lantana Lane, Celina, TX, 75009, in Collin County.

Who is the owner or developer of Lilyana Phase 5?

First Service Residencial is the property owner/developer of record for Lilyana Phase 5, per its TDLR project registration.

Who is the architect or design firm for Lilyana Phase 5?

Garthoff Design is the design firm of record for Lilyana Phase 5, according to its TDLR filing.

How much does Lilyana Phase 5 cost and how big is it?

Lilyana Phase 5 has an estimated construction value of $1.4M and approximately 107,000 square feet (about $13/sqft), based on its TDLR filing.

Scope of Work

New construction amenity center including restroom building, pool facilities and outdoor recreation areas.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Lot 5X, Block X, Lantana Lane, Celina, TX, 75009

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related Projects

Watch all construction in 75009 (Celina)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.