Project intelligenceTDLR TABS2022011488New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Marble Falls Avenue N Bridge at Backbone Creek

304 Avenue N, Marble Falls, TX, 78654

Target date passed (Feb 2024)Review Complete

Marble Falls Avenue N Bridge at Backbone Creek is a new construction project at 304 Avenue N, Marble Falls, in Burnet County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Feb 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $111K across about 11,040 sq ft.

Estimated project value
$111K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
11,040 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$10/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 10, 2022721 days across supplied datesFeb 1, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    111 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    610 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78654 (Marble Falls)

One email per change. Unsubscribe in one click. Privacy.

Marble Falls Avenue N Bridge at Backbone Creek is a New Construction project located at 304 Avenue N, Marble Falls, TX 78654 in Marble Falls, Texas. The project has an estimated value of $111K covering 11,040 sq ft. City of Marble Falls is the property owner and TRC is the design firm of record. The project was registered with TDLR on February 10, 2022.

Frequently Asked Questions

What is Marble Falls Avenue N Bridge at Backbone Creek?

Marble Falls Avenue N Bridge at Backbone Creek is a new construction project at 304 Avenue N in Marble Falls, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolition of a low water crossing and construction of a pier supported bridge along with roadway and sidewalk improvements.

Is Marble Falls Avenue N Bridge at Backbone Creek open in Marble Falls?

Marble Falls Avenue N Bridge at Backbone Creek was scheduled to finish construction in Feb 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Marble Falls Avenue N Bridge at Backbone Creek located?

Marble Falls Avenue N Bridge at Backbone Creek is located at 304 Avenue N, Marble Falls, TX, 78654, in Burnet County.

Who is the owner or developer of Marble Falls Avenue N Bridge at Backbone Creek?

City of Marble Falls is the property owner/developer of record for Marble Falls Avenue N Bridge at Backbone Creek, per its TDLR project registration.

Who is the architect or design firm for Marble Falls Avenue N Bridge at Backbone Creek?

TRC is the design firm of record for Marble Falls Avenue N Bridge at Backbone Creek, according to its TDLR filing.

How much does Marble Falls Avenue N Bridge at Backbone Creek cost and how big is it?

Marble Falls Avenue N Bridge at Backbone Creek has an estimated construction value of $111K and approximately 11,040 square feet (about $10/sqft), based on its TDLR filing.

Scope of Work

Demolition of a low water crossing and construction of a pier supported bridge along with roadway and sidewalk improvements.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

304 Avenue N, Marble Falls, TX, 78654

30.56991, -98.27286

Watch all construction in 78654 (Marble Falls)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Marble Falls?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.