Northbrook High School Cooler Freezer Replacement in Houston, TX
1 Raider Circle South, Houston, TX, 77080
Northbrook High School Cooler Freezer Replacement is a renovation/alteration project at 1 Raider Circle South, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2022 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $297K across about 550 sq ft.
- Estimated project value
- $297K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 550 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $541/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
98 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
59 days after the preceding date shown.
Source: TDLR filing
View source record
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77080 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Northbrook High School Cooler Freezer Replacement is a Renovation/Alteration project located at 1 Raider Circle South, Houston, TX 77080 in Houston, Texas. The project has an estimated value of $297K covering 550 sq ft. Spring Branch Independent School District is the property owner and PBK Architects is the design firm of record. The project was registered with TDLR on February 23, 2022.
Frequently Asked Questions
What is Northbrook High School Cooler Freezer Replacement?
Northbrook High School Cooler Freezer Replacement is a renovation/alteration project at 1 Raider Circle South in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Existing walk-in cooler and freezer are being replaced. Minor adjustment to adjacent storage room.
Is Northbrook High School Cooler Freezer Replacement open in Houston?
Northbrook High School Cooler Freezer Replacement was scheduled to finish construction in Jul 2022 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Northbrook High School Cooler Freezer Replacement located?
Northbrook High School Cooler Freezer Replacement is located at 1 Raider Circle South, Houston, TX, 77080, in Harris County.
Who is the owner or developer of Northbrook High School Cooler Freezer Replacement?
Spring Branch Independent School District is the property owner/developer of record for Northbrook High School Cooler Freezer Replacement, per its TDLR project registration.
Who is the architect or design firm for Northbrook High School Cooler Freezer Replacement?
PBK Architects is the design firm of record for Northbrook High School Cooler Freezer Replacement, according to its TDLR filing.
How much does Northbrook High School Cooler Freezer Replacement cost and how big is it?
Northbrook High School Cooler Freezer Replacement has an estimated construction value of $297K and approximately 550 square feet (about $541/sqft), based on its TDLR filing.
Scope of Work
Existing walk-in cooler and freezer are being replaced. Minor adjustment to adjacent storage room.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1 Raider Circle South, Houston, TX, 77080
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$960.4M totalRelated City Permits
Building permits found at or near this location
31,000 SF SCHOOL REMODEL WITH SITE IMPRVMTS 1-3-1-E-B 21 IBC FA
Watch all construction in 77080 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.