Project intelligenceTDLR TABS2022012455New Construction
Funding type

This project is privately funded, on private land for private use.

Mesquite Airport Logistics Center – Building 4

1525 Airport Blvd., Mesquite, TX, 75181

Construction complete · Sep 2023Project Closed

Mesquite Airport Logistics Center – Building 4 is a new construction project at 1525 Airport Blvd., Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2023). The project has an estimated value of $18.3M across about 342,196 sq ft.

Estimated project value
$18.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
342,196 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$54/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 23, 2022555 days across supplied datesSep 1, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    67 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    488 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75181 (Mesquite)

One email per change. Unsubscribe in one click. Privacy.

Mesquite Airport Logistics Center – Building 4 is a New Construction project located at 1525 Airport Blvd., Mesquite, TX 75181 in Mesquite, Texas. The project has an estimated value of $18.3M covering 342,196 sq ft. Dalfen Industrial, LLC is the property owner and GSR Andrade Architects is the design firm of record. The project was registered with TDLR on February 23, 2022.

Frequently Asked Questions

What is Mesquite Airport Logistics Center – Building 4?

Mesquite Airport Logistics Center – Building 4 is a new construction project at 1525 Airport Blvd. in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A 342,196 SF speculative tilt-wall industrial facility (Shell only)

Is Mesquite Airport Logistics Center – Building 4 open in Mesquite?

Construction on Mesquite Airport Logistics Center – Building 4 is complete — TDLR records show the project passed its required accessibility inspection in Sep 2023. The building is finished and very likely open.

Where is Mesquite Airport Logistics Center – Building 4 located?

Mesquite Airport Logistics Center – Building 4 is located at 1525 Airport Blvd., Mesquite, TX, 75181, in Dallas County.

Who is the owner or developer of Mesquite Airport Logistics Center – Building 4?

Dalfen Industrial, LLC is the property owner/developer of record for Mesquite Airport Logistics Center – Building 4, per its TDLR project registration.

Who is the architect or design firm for Mesquite Airport Logistics Center – Building 4?

GSR Andrade Architects is the design firm of record for Mesquite Airport Logistics Center – Building 4, according to its TDLR filing.

How much does Mesquite Airport Logistics Center – Building 4 cost and how big is it?

Mesquite Airport Logistics Center – Building 4 has an estimated construction value of $18.3M and approximately 342,196 square feet (about $54/sqft), based on its TDLR filing.

Scope of Work

A 342,196 SF speculative tilt-wall industrial facility (Shell only)

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1525 Airport Blvd., Mesquite, TX, 75181

Location by street address

Watch all construction in 75181 (Mesquite)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mesquite?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.