Districtwide Traffic Control FY 2022 Project 2 in San Antonio, TX

Various Locations, San Antonio, TX, 78229

Construction complete · Jul 2025Project Closed

Districtwide Traffic Control FY 2022 Project 2 is a new construction project at Various Locations, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2025). The project has an estimated value of $122K across about 2,305 sq ft.

Estimated project value
$122K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,305 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$53/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 9, 20221,210 days across supplied datesJul 1, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    114 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    1,096 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78229 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

Districtwide Traffic Control FY 2022 Project 2 is a New Construction project located at Various Locations, San Antonio, TX 78229 in San Antonio, Texas. The project has an estimated value of $122K covering 2,305 sq ft. TxDOT District: San Antonio is the property owner. The project was registered with TDLR on March 9, 2022.

Frequently Asked Questions

What is Districtwide Traffic Control FY 2022 Project 2?

Districtwide Traffic Control FY 2022 Project 2 is a new construction project at Various Locations in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Traffic Signal Improvements.

Is Districtwide Traffic Control FY 2022 Project 2 open in San Antonio?

Construction on Districtwide Traffic Control FY 2022 Project 2 is complete — TDLR records show the project passed its required accessibility inspection in Jul 2025. The building is finished and very likely open.

Where is Districtwide Traffic Control FY 2022 Project 2 located?

Districtwide Traffic Control FY 2022 Project 2 is located at Various Locations, San Antonio, TX, 78229, in Bexar County.

Who is the owner or developer of Districtwide Traffic Control FY 2022 Project 2?

TxDOT District: San Antonio is the property owner/developer of record for Districtwide Traffic Control FY 2022 Project 2, per its TDLR project registration.

How much does Districtwide Traffic Control FY 2022 Project 2 cost and how big is it?

Districtwide Traffic Control FY 2022 Project 2 has an estimated construction value of $122K and approximately 2,305 square feet (about $53/sqft), based on its TDLR filing.

Scope of Work

Traffic Signal Improvements.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Various Locations, San Antonio, TX, 78229

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78229 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.