Project intelligenceTDLR TABS2022014286New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Cumby ISD High School & CTE

303 Sayle Street, Cumby, TX, 75433

Construction complete · Apr 2023Inspection Complete

Cumby ISD High School & CTE is a new construction project at 303 Sayle Street, Cumby, in Hopkins County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2023). The project has an estimated value of $6.0M across about 36,000 sq ft.

Estimated project value
$6.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
36,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$167/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 16, 2022410 days across supplied datesApr 30, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    380 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75433 (Cumby)

One email per change. Unsubscribe in one click. Privacy.

Cumby ISD High School & CTE is a New Construction project located at 303 Sayle Street, Cumby, TX 75433 in Cumby, Texas. The project has an estimated value of $6.0M covering 36,000 sq ft. Cumby Independent School District is the property owner and Goodwin-Lasiter-Strong is the design firm of record. The project was registered with TDLR on March 16, 2022.

Frequently Asked Questions

What is Cumby ISD High School & CTE?

Cumby ISD High School & CTE is a new construction project at 303 Sayle Street in Cumby, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New high school and CTE building.

Is Cumby ISD High School & CTE open in Cumby?

Construction on Cumby ISD High School & CTE is complete — TDLR records show the project passed its required accessibility inspection in Apr 2023. The building is finished and very likely open.

Where is Cumby ISD High School & CTE located?

Cumby ISD High School & CTE is located at 303 Sayle Street, Cumby, TX, 75433, in Hopkins County.

Who is the owner or developer of Cumby ISD High School & CTE?

Cumby Independent School District is the property owner/developer of record for Cumby ISD High School & CTE, per its TDLR project registration.

Who is the architect or design firm for Cumby ISD High School & CTE?

Goodwin-Lasiter-Strong is the design firm of record for Cumby ISD High School & CTE, according to its TDLR filing.

How much does Cumby ISD High School & CTE cost and how big is it?

Cumby ISD High School & CTE has an estimated construction value of $6.0M and approximately 36,000 square feet (about $167/sqft), based on its TDLR filing.

Scope of Work

New high school and CTE building.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

303 Sayle Street, Cumby, TX, 75433

33.13446, -95.84526

Watch all construction in 75433 (Cumby)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.