Design review complete, construction may proceed
๐Scope of Work
New construction of an apartment complex with three buildings: 1) bldg-1 12units, bldg-2 24 units & bldg-3 (9) units.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$8.8M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Fire Damage repair replacing all components like-for-like. The electrical scope of work will include replacement of some electrical boxes and associated wire. The existing panel will remain pending inspector approval. The mechanical scope will include replacement of the HVAC system. The plumbing scope will consist of replacing the tub waste and overflow and damaged fixtures. The balance of the scope will be replacing insulation as required sheetrock (including installation of 2 layers of 5/8 Type X sheetrock on the ceilings) cabinets fixtures as required and remaining finishes. Two replacement windows will require fall protection.
Fire Damage repair replacing all components like-for-like. The electrical scope of work will include replacement of some electrical boxes and associated wire. The existing panel will remain pending inspector approval. The mechanical scope will include replacement of the HVAC system. The plumbing scope will consist of replacing the tub waste and overflow and damaged fixtures. The balance of the scope will be replacing insulation as required sheetrock (including installation of 2 layers of 5/8 Type X sheetrock on the ceilings) cabinets fixtures as required and remaining finishes. Two replacement windows will require fall protection.
Fire Damage repair replacing all components like-for-like. The electrical scope of work will include replacement of some electrical boxes and associated wire. The existing panel will remain pending inspector approval. The mechanical scope will include replacement of the HVAC system. The plumbing scope will consist of replacing the tub waste and overflow and damaged fixtures. The balance of the scope will be replacing insulation as required sheetrock (including installation of 2 layers of 5/8 Type X sheetrock on the ceilings) cabinets fixtures as required and remaining finishes. Two replacement windows will require fall protection.
Fire Damage repair replacing all components like-for-like. The electrical scope of work will include replacement of some electrical boxes and associated wire. The existing panel will remain pending inspector approval. The mechanical scope will include replacement of the HVAC system. The plumbing scope will consist of replacing the tub waste and overflow and damaged fixtures. The balance of the scope will be replacing insulation as required sheetrock (including installation of 2 layers of 5/8 Type X sheetrock on the ceilings) cabinets fixtures as required and remaining finishes. Two replacement windows will require fall protection.
Water Line Repair Outside by Bldg 13