MISD Multipurpose Pavilion - Mesquite High School
300 E Davis St, Mesquite, TX, 75149
MISD Multipurpose Pavilion - Mesquite High School is a renovation/alteration project at 300 E Davis St, Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2024). The project has an estimated value of $3.5M across about 43,000 sq ft.
- Estimated project value
- $3.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 43,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $81/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 5mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
130 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
518 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75149 (Mesquite)
One email per change. Unsubscribe in one click. Privacy.
MISD Multipurpose Pavilion - Mesquite High School is a Renovation/Alteration project located at 300 E Davis St, Mesquite, TX 75149 in Mesquite, Texas. The project has an estimated value of $3.5M covering 43,000 sq ft. Mesquite ISD is the property owner and WRA Architects, Inc. is the design firm of record. The project was registered with TDLR on March 24, 2022.
Frequently Asked Questions
What is MISD Multipurpose Pavilion - Mesquite High School?
MISD Multipurpose Pavilion - Mesquite High School is a renovation/alteration project at 300 E Davis St in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Outdoor turfed multipurpose athletic field.
Is MISD Multipurpose Pavilion - Mesquite High School open in Mesquite?
Construction on MISD Multipurpose Pavilion - Mesquite High School is complete — TDLR records show the project passed its required accessibility inspection in Jan 2024. The building is finished and very likely open.
Where is MISD Multipurpose Pavilion - Mesquite High School located?
MISD Multipurpose Pavilion - Mesquite High School is located at 300 E Davis St, Mesquite, TX, 75149, in Dallas County.
Who is the owner or developer of MISD Multipurpose Pavilion - Mesquite High School?
Mesquite ISD is the property owner/developer of record for MISD Multipurpose Pavilion - Mesquite High School, per its TDLR project registration.
Who is the architect or design firm for MISD Multipurpose Pavilion - Mesquite High School?
WRA Architects, Inc. is the design firm of record for MISD Multipurpose Pavilion - Mesquite High School, according to its TDLR filing.
How much does MISD Multipurpose Pavilion - Mesquite High School cost and how big is it?
MISD Multipurpose Pavilion - Mesquite High School has an estimated construction value of $3.5M and approximately 43,000 square feet (about $81/sqft), based on its TDLR filing.
Scope of Work
Outdoor turfed multipurpose athletic field.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Related Projects
Same Owner
$785.1M totalWatch all construction in 75149 (Mesquite)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.