Project intelligenceTDLR TABS2022015109New Construction
Funding type

This project is privately funded, on private land for private use.

Good Shepherd Reformed Episcopal Church : New Nave

2525 Old Jacksonville Hwy, Tyler, TX, 75701

Construction complete · Jul 2022Project Closed

Good Shepherd Reformed Episcopal Church : New Nave is a new construction project at 2525 Old Jacksonville Hwy, Tyler, in Smith County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2022). The project has an estimated value of $6.1M across about 15,000 sq ft.

Estimated project value
$6.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
15,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$407/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 28, 202295 days across supplied datesJul 1, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    34 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

📰About Good Shepherd Reformed Episcopal Church : New Nave

Good Shepherd Reformed Episcopal Church of Tyler constructed a new 15,000 sq ft Nave at 2525 Old Jacksonville Hwy in Tyler, Texas. This new construction project carried an estimated cost of $6,100,000, resulting in a computed cost of $407 per square foot. The facility was designed by Butler Architectural Group, with James Chesley Fancher serving as the registered accessibility specialist.

Construction Scope and Cost

The filing describes the work as the construction of a new Nave or worship space. This privately funded project took place on private land for private use. The estimated cost places this build in the top quarter of new construction filings in Smith County, where the median estimated cost is $832,600. The project's $407 per square foot is above the county median of $162.

The scheduled build window for this project was 61 days, which is shorter than the county median of 214 days for similar new construction work. Butler Architectural Group has three other TDLR-registered projects, including the Cumberland Academy Upper Middle School in Tyler, which had an estimated cost of $6,900,000.

Project Status and Timeline

The project was registered with TDLR in March 2022, with construction starting in May 2022. The filing indicated a completion date of July 2022. TDLR closed the project file in July 2022, which marks the end of the accessibility review process for this construction. The status is listed as Project Closed.

Other registered projects in the Tyler area include renovations at Green Acres Shopping Center and a new construction project for Starbucks. The ZIP code 75701 has a population of about 35,804, with a median household income of $62,091 according to U.S. Census ACS 2023 estimates.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75701 (Tyler)

One email per change. Unsubscribe in one click. Privacy.

Good Shepherd Reformed Episcopal Church : New Nave is a New Construction project located at 2525 Old Jacksonville Hwy, Tyler, TX 75701 in Tyler, Texas. The project has an estimated value of $6.1M covering 15,000 sq ft. Good Shepherd Reformed Episcopal Church of Tyler is the property owner and Butler Architectural Group is the design firm of record. The project was registered with TDLR on March 28, 2022.

Frequently Asked Questions

Is the church open?

The TDLR record indicates the construction project was completed and the file closed in July 2022. The record does not confirm current business operating hours or public access status.

Who designed the building?

Butler Architectural Group is the design firm of record for this new Nave construction project in Tyler.

How much did it cost?

The estimated cost for this 15,000 sq ft new construction project was $6,100,000.

When was it built?

Construction started in May 2022, and the project file was closed in July 2022.

What is Good Shepherd Reformed Episcopal Church : New Nave?

Good Shepherd Reformed Episcopal Church : New Nave is a new construction project at 2525 Old Jacksonville Hwy in Tyler, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a new Nave / worship space.

Is Good Shepherd Reformed Episcopal Church : New Nave open in Tyler?

Construction on Good Shepherd Reformed Episcopal Church : New Nave is complete — TDLR records show the project passed its required accessibility inspection in Jul 2022. The building is finished and very likely open.

Where is Good Shepherd Reformed Episcopal Church : New Nave located?

Good Shepherd Reformed Episcopal Church : New Nave is located at 2525 Old Jacksonville Hwy, Tyler, TX, 75701, in Smith County.

Who is the owner or developer of Good Shepherd Reformed Episcopal Church : New Nave?

Good Shepherd Reformed Episcopal Church of Tyler is the property owner/developer of record for Good Shepherd Reformed Episcopal Church : New Nave, per its TDLR project registration.

Who is the architect or design firm for Good Shepherd Reformed Episcopal Church : New Nave?

Butler Architectural Group is the design firm of record for Good Shepherd Reformed Episcopal Church : New Nave, according to its TDLR filing.

How much does Good Shepherd Reformed Episcopal Church : New Nave cost and how big is it?

Good Shepherd Reformed Episcopal Church : New Nave has an estimated construction value of $6.1M and approximately 15,000 square feet (about $407/sqft), based on its TDLR filing.

Scope of Work

Construction of a new Nave / worship space.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2525 Old Jacksonville Hwy, Tyler, TX, 75701

Location by street address

Watch all construction in 75701 (Tyler)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.