Project intelligenceTDLR TABS2022015594New Construction
Funding type

This project is privately funded, on private land for private use.

Wapiti Suite 110 finish out

9121 Adams Lane, Temple, TX, 76502

Target date passed (Nov 2022)Review Complete

Wapiti Suite 110 finish out is a new construction project at 9121 Adams Lane, Temple, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Nov 2022 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $250K across about 1,604 sq ft.

Estimated project value
$250K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,604 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$156/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 2, 2022242 days across supplied datesNov 30, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    16 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    226 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76502 (Temple)

One email per change. Unsubscribe in one click. Privacy.

Wapiti Suite 110 finish out is a New Construction project located at 9121 Adams Lane, Temple, TX 76502 in Temple, Texas. The project has an estimated value of $250K covering 1,604 sq ft. Wapiti Investment Properties is the property owner and Garcia Architects, Inc. is the design firm of record. The project was registered with TDLR on April 2, 2022.

Frequently Asked Questions

What is Wapiti Suite 110 finish out?

Wapiti Suite 110 finish out is a new construction project at 9121 Adams Lane in Temple, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Finish out of a tenant lease space

Is Wapiti Suite 110 finish out open in Temple?

Wapiti Suite 110 finish out was scheduled to finish construction in Nov 2022 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Wapiti Suite 110 finish out located?

Wapiti Suite 110 finish out is located at 9121 Adams Lane, Temple, TX, 76502, in Bell County.

Who is the owner or developer of Wapiti Suite 110 finish out?

Wapiti Investment Properties is the property owner/developer of record for Wapiti Suite 110 finish out, per its TDLR project registration.

Who is the architect or design firm for Wapiti Suite 110 finish out?

Garcia Architects, Inc. is the design firm of record for Wapiti Suite 110 finish out, according to its TDLR filing.

How much does Wapiti Suite 110 finish out cost and how big is it?

Wapiti Suite 110 finish out has an estimated construction value of $250K and approximately 1,604 square feet (about $156/sqft), based on its TDLR filing.

Scope of Work

Finish out of a tenant lease space

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Watch all construction in 76502 (Temple)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Bell

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists