Project intelligenceTDLR TABS2022016137New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Spur 5 (SH 35) in Houston, TX

From: Griggs Rd To: IH 45, Houston, TX, 77023

Opening ~Dec 2026Review Complete

Spur 5 (SH 35) is a new construction project at From: Griggs Rd To: IH 45, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $83.1M across about 10,019 sq ft.

Estimated project value
$83.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
10,019 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$8.30K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3y 11mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 8, 20221,728 days across supplied datesDec 31, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    327 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,401 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77023 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Spur 5 (SH 35) is a New Construction project located at From: Griggs Rd To: IH 45, Houston, TX 77023 in Houston, Texas. The project has an estimated value of $83.1M covering 10,019 sq ft. TxDOT District: Houston is the property owner and IDCUS, Inc. is the design firm of record. The project was registered with TDLR on April 8, 2022.

Frequently Asked Questions

What is Spur 5 (SH 35)?

Spur 5 (SH 35) is a new construction project at From: Griggs Rd To: IH 45 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of New Freeway Facility, including grading, structures, CRCP pavement, retaining walls, drainage, signing, pavement markings, signals, illumination and SWP3.

Is Spur 5 (SH 35) open in Houston?

Spur 5 (SH 35) is still under construction in Houston, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is Spur 5 (SH 35) located?

Spur 5 (SH 35) is located at From: Griggs Rd To: IH 45, Houston, TX, 77023, in Harris County.

Who is the owner or developer of Spur 5 (SH 35)?

TxDOT District: Houston is the property owner/developer of record for Spur 5 (SH 35), per its TDLR project registration.

Who is the architect or design firm for Spur 5 (SH 35)?

IDCUS, Inc. is the design firm of record for Spur 5 (SH 35), according to its TDLR filing.

How much does Spur 5 (SH 35) cost and how big is it?

Spur 5 (SH 35) has an estimated construction value of $83.1M and approximately 10,019 square feet (about $8.30K/sqft), based on its TDLR filing.

Scope of Work

Construction of New Freeway Facility, including grading, structures, CRCP pavement, retaining walls, drainage, signing, pavement markings, signals, illumination and SWP3.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From: Griggs Rd To: IH 45, Houston, TX, 77023

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77023 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.