Project intelligenceTDLR TABS2022017418Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

HEB ISD | Transition Center Conversion in Bedford, TX

1849 Central Drive, Bedford, TX, 76022

Construction complete · Jan 2023Project Closed

HEB ISD | Transition Center Conversion is a renovation/alteration project at 1849 Central Drive, Bedford, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2023). The project has an estimated value of $2.0M across about 13,250 sq ft.

Estimated project value
$2.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
13,250 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$151/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 25, 2022281 days across supplied datesJan 31, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    251 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76022 (Bedford)

One email per change. Unsubscribe in one click. Privacy.

HEB ISD | Transition Center Conversion is a Renovation/Alteration project located at 1849 Central Drive, Bedford, TX 76022 in Bedford, Texas. The project has an estimated value of $2.0M covering 13,250 sq ft. HEB ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on April 25, 2022.

Frequently Asked Questions

What is HEB ISD | Transition Center Conversion?

HEB ISD | Transition Center Conversion is a renovation/alteration project at 1849 Central Drive in Bedford, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Transition Center Conversion for HEB ISD.

Is HEB ISD | Transition Center Conversion open in Bedford?

Construction on HEB ISD | Transition Center Conversion is complete — TDLR records show the project passed its required accessibility inspection in Jan 2023. The building is finished and very likely open.

Where is HEB ISD | Transition Center Conversion located?

HEB ISD | Transition Center Conversion is located at 1849 Central Drive, Bedford, TX, 76022, in Tarrant County.

Who is the owner or developer of HEB ISD | Transition Center Conversion?

HEB ISD is the property owner/developer of record for HEB ISD | Transition Center Conversion, per its TDLR project registration.

Who is the architect or design firm for HEB ISD | Transition Center Conversion?

Huckabee is the design firm of record for HEB ISD | Transition Center Conversion, according to its TDLR filing.

How much does HEB ISD | Transition Center Conversion cost and how big is it?

HEB ISD | Transition Center Conversion has an estimated construction value of $2.0M and approximately 13,250 square feet (about $151/sqft), based on its TDLR filing.

Scope of Work

Transition Center Conversion for HEB ISD.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1849 Central Drive, Bedford, TX, 76022

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76022 (Bedford)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.