Project intelligenceTDLR TABS2022017998Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

ST MARY'S SCHOOL 4 PORTABLES in Taylor, TX

502 & 504 EKKIOTT ST, Taylor, TX, 76571

Target date passed (Sep 2022)Review Complete

ST MARY'S SCHOOL 4 PORTABLES is a renovation/alteration project at 502 & 504 EKKIOTT ST, Taylor, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2022 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $200K across about 6,200 sq ft.

Estimated project value
$200K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
6,200 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$32/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 1, 2022123 days across supplied datesSep 1, 2022

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    1 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76571 (Taylor)

One email per change. Unsubscribe in one click. Privacy.

ST MARY'S SCHOOL 4 PORTABLES is a Renovation/Alteration project located at 502 & 504 EKKIOTT ST, Taylor, TX 76571 in Taylor, Texas. The project has an estimated value of $200K covering 6,200 sq ft. BISHOP OF THE CATHOLIC DIOCESE OF AUSTIN is the property owner and N/A is the design firm of record. The project was registered with TDLR on May 2, 2022.

Frequently Asked Questions

What is ST MARY'S SCHOOL 4 PORTABLES?

ST MARY'S SCHOOL 4 PORTABLES is a renovation/alteration project at 502 & 504 EKKIOTT ST in Taylor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: MOVE 4 PORTABLE SCHOOL BLDGS (1534 SQFT EACH) TO A LOT CURRENTLY PART OF ST MARY OF THE ASSUMPTION CATHOLIC CHURCH GROUNDS,SET BLDGS,CONSTRUCT ACCESS RAMPS,PROVEISE CONCRETE WALKWAY,CONSTRUCT SAFETY FENCING,PAINT INTERIOR & EXTERIOR AS N…

Is ST MARY'S SCHOOL 4 PORTABLES open in Taylor?

ST MARY'S SCHOOL 4 PORTABLES was scheduled to finish construction in Sep 2022 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is ST MARY'S SCHOOL 4 PORTABLES located?

ST MARY'S SCHOOL 4 PORTABLES is located at 502 & 504 EKKIOTT ST, Taylor, TX, 76571, in Williamson County.

Who is the owner or developer of ST MARY'S SCHOOL 4 PORTABLES?

BISHOP OF THE CATHOLIC DIOCESE OF AUSTIN is the property owner/developer of record for ST MARY'S SCHOOL 4 PORTABLES, per its TDLR project registration.

Who is the architect or design firm for ST MARY'S SCHOOL 4 PORTABLES?

N/A is the design firm of record for ST MARY'S SCHOOL 4 PORTABLES, according to its TDLR filing.

How much does ST MARY'S SCHOOL 4 PORTABLES cost and how big is it?

ST MARY'S SCHOOL 4 PORTABLES has an estimated construction value of $200K and approximately 6,200 square feet (about $32/sqft), based on its TDLR filing.

Scope of Work

MOVE 4 PORTABLE SCHOOL BLDGS (1534 SQFT EACH) TO A LOT CURRENTLY PART OF ST MARY OF THE ASSUMPTION CATHOLIC CHURCH GROUNDS,SET BLDGS,CONSTRUCT ACCESS RAMPS,PROVEISE CONCRETE WALKWAY,CONSTRUCT SAFETY FENCING,PAINT INTERIOR & EXTERIOR AS NEEDED

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

502 & 504 EKKIOTT ST, Taylor, TX, 76571

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

502 GENARD ST

Express: Foundation repair - install 5 push piers

ActiveBuilding PermitRepairNov 2026
$1
View Details
2026-147286 BP
Foundation Support Specialists
502 TANNER TRL

200amp main breaker panel upgrade adding surge protection and complete grounding system. AE is the electrical provider.

ActiveElectrical PermitUpgradeNov 2026
View Details
2026-142466 EP
Mister Sparky Austin
502 OAKLAND AVE

ePlan-Expedited Review: [APPROVED] Interior Remodel and Change of Use from Child Daycare to Personal Improvement Service. Scope of work to include demo of flooring fans plumbing fixtures light fixtures update parking stalls to meet zoning requirements (2503 SF)

ActiveElectrical PermitRemodelNov 2026
View Details
2023-118288 EP
Marks Electric
502 STRAWBERRY CV

Replacement of complete existing central heat and air system with or without duct work 3Ton gas system replacement

ActiveMechanical PermitChange OutOct 2026
View Details
2026-124443 MP
Greg's Heating and Air
502 W CRESTLAND DR

New in-ground pool and concrete deck w/ autofill and/or heating system

ActiveElectrical PermitNewOct 2026
View Details
2026-099483 EP
LED ES Electric

Watch all construction in 76571 (Taylor)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.