Project intelligenceTDLR TABS2022018000New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

IH 30 in Texarkana, TX

IH 30 and FM 989, Texarkana, TX, 75503

Target date passed (Aug 2026)Review Complete

IH 30 is a new construction project at IH 30 and FM 989, Texarkana, in Bowie County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $930K across about 10,000 sq ft.

Estimated project value
$930K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
10,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$93/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 years
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 2, 20221,552 days across supplied datesAug 1, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,430 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75503 (Texarkana)

One email per change. Unsubscribe in one click. Privacy.

IH 30 is a New Construction project located at IH 30 and FM 989, Texarkana, TX 75503 in Texarkana, Texas. The project has an estimated value of $930K covering 10,000 sq ft. TxDOT District: Atlanta is the property owner. The project was registered with TDLR on May 2, 2022.

Frequently Asked Questions

What is IH 30?

IH 30 is a new construction project at IH 30 and FM 989 in Texarkana, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project is to add frontage roads along IH 30 in Bowie CO which includes the addition of sidewalks along the North Frontage Road. The project also reconstructs a portion of FM 989 north of IH 30 to include sidewalk on both sides of the road.

Is IH 30 open in Texarkana?

IH 30 was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is IH 30 located?

IH 30 is located at IH 30 and FM 989, Texarkana, TX, 75503, in Bowie County.

Who is the owner or developer of IH 30?

TxDOT District: Atlanta is the property owner/developer of record for IH 30, per its TDLR project registration.

How much does IH 30 cost and how big is it?

IH 30 has an estimated construction value of $930K and approximately 10,000 square feet (about $93/sqft), based on its TDLR filing.

Scope of Work

Project is to add frontage roads along IH 30 in Bowie CO which includes the addition of sidewalks along the North Frontage Road. The project also reconstructs a portion of FM 989 north of IH 30 to include sidewalk on both sides of the road.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

IH 30 and FM 989, Texarkana, TX, 75503

Loading location map…
33.41989, -94.44796

Watch all construction in 75503 (Texarkana)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Texarkana?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.