Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
City of Frisco Central Fire Station Dormitory Renovation
8601 Gary Burns Dr., Frisco, TX, 75204
City of Frisco Central Fire Station Dormitory Renovation is a renovation/alteration project at 8601 Gary Burns Dr., Frisco, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2022). The project has an estimated value of $375K across about 1,206 sq ft.
- Estimated project value
- $375K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,206 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $311/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
68 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
92 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75204 (Frisco)
One email per change. Unsubscribe in one click. Privacy.
City of Frisco Central Fire Station Dormitory Renovation is a Renovation/Alteration project located at 8601 Gary Burns Dr., Frisco, TX 75204 in Frisco, Texas. The project has an estimated value of $375K covering 1,206 sq ft. City of Frisco is the property owner. The project was registered with TDLR on May 11, 2022.
Frequently Asked Questions
What is City of Frisco Central Fire Station Dormitory Renovation?
City of Frisco Central Fire Station Dormitory Renovation is a renovation/alteration project at 8601 Gary Burns Dr. in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The existing dormitory will be divided into individual sleeping units. The rescue captain’s office will be renovated to have a separate sleeping unit inside the office. All the HVAC ductwork and light fixtures will be replaced with new.
Is City of Frisco Central Fire Station Dormitory Renovation open in Frisco?
Construction on City of Frisco Central Fire Station Dormitory Renovation is complete — TDLR records show the project passed its required accessibility inspection in Oct 2022. The building is finished and very likely open.
Where is City of Frisco Central Fire Station Dormitory Renovation located?
City of Frisco Central Fire Station Dormitory Renovation is located at 8601 Gary Burns Dr., Frisco, TX, 75204, in Dallas County.
Who is the owner or developer of City of Frisco Central Fire Station Dormitory Renovation?
City of Frisco is the property owner/developer of record for City of Frisco Central Fire Station Dormitory Renovation, per its TDLR project registration.
How much does City of Frisco Central Fire Station Dormitory Renovation cost and how big is it?
City of Frisco Central Fire Station Dormitory Renovation has an estimated construction value of $375K and approximately 1,206 square feet (about $311/sqft), based on its TDLR filing.
Scope of Work
The existing dormitory will be divided into individual sleeping units. The rescue captain’s office will be renovated to have a separate sleeping unit inside the office. All the HVAC ductwork and light fixtures will be replaced with new.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
8601 Gary Burns Dr., Frisco, TX, 75204
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Watch all construction in 75204 (Frisco)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Frisco?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.