Project intelligenceTDLR TABS2022018880Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Bond 2020 Roy Miller High School Renovation in Corpus Christi, TX

1 Battlin Buc Blvd., Corpus Christi, TX, 78408

Construction complete · Dec 2023Inspection Complete

Bond 2020 Roy Miller High School Renovation is a renovation/alteration project at 1 Battlin Buc Blvd., Corpus Christi, in Nueces County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2023). The project has an estimated value of $4.0M across about 120,000 sq ft.

Estimated project value
$4.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
120,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$33/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 12, 2022598 days across supplied datesDec 31, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    25 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    573 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78408 (Corpus Christi)

One email per change. Unsubscribe in one click. Privacy.

Bond 2020 Roy Miller High School Renovation is a Renovation/Alteration project located at 1 Battlin Buc Blvd., Corpus Christi, TX 78408 in Corpus Christi, Texas. The project has an estimated value of $4.0M covering 120,000 sq ft. Corpus Christi Independent School District is the property owner and SolkaNavaTorno, LLC Architects is the design firm of record. The project was registered with TDLR on May 12, 2022.

Frequently Asked Questions

What is Bond 2020 Roy Miller High School Renovation?

Bond 2020 Roy Miller High School Renovation is a renovation/alteration project at 1 Battlin Buc Blvd. in Corpus Christi, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of original 3-story school building to include new interior finishes, limited demolition and new walls; Will include limited HVAC, plumbing, electrical work and no exterior wall construction with limited yard drainage…

Is Bond 2020 Roy Miller High School Renovation open in Corpus Christi?

Construction on Bond 2020 Roy Miller High School Renovation is complete — TDLR records show the project passed its required accessibility inspection in Dec 2023. The building is finished and very likely open.

Where is Bond 2020 Roy Miller High School Renovation located?

Bond 2020 Roy Miller High School Renovation is located at 1 Battlin Buc Blvd., Corpus Christi, TX, 78408, in Nueces County.

Who is the owner or developer of Bond 2020 Roy Miller High School Renovation?

Corpus Christi Independent School District is the property owner/developer of record for Bond 2020 Roy Miller High School Renovation, per its TDLR project registration.

Who is the architect or design firm for Bond 2020 Roy Miller High School Renovation?

SolkaNavaTorno, LLC Architects is the design firm of record for Bond 2020 Roy Miller High School Renovation, according to its TDLR filing.

How much does Bond 2020 Roy Miller High School Renovation cost and how big is it?

Bond 2020 Roy Miller High School Renovation has an estimated construction value of $4.0M and approximately 120,000 square feet (about $33/sqft), based on its TDLR filing.

Scope of Work

Interior renovation of original 3-story school building to include new interior finishes, limited demolition and new walls; Will include limited HVAC, plumbing, electrical work and no exterior wall construction with limited yard drainage work.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1 Battlin Buc Blvd., Corpus Christi, TX, 78408

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78408 (Corpus Christi)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Corpus Christi?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.