Project intelligenceTDLR TABS2022018886Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Bellaire Boulevard Turn Lanes at SH 99 in Richmond, TX

Bellaire Boulevard at SH 99, Richmond, TX, 77406

Target date passed (Jan 2023)Review Complete

Bellaire Boulevard Turn Lanes at SH 99 is a renovation/alteration project at Bellaire Boulevard at SH 99, Richmond, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jan 2023 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $68K across about 9,150 sq ft.

Estimated project value
$68K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
9,150 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$7/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 12, 2022260 days across supplied datesJan 27, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    144 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    116 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77406 (Richmond)

One email per change. Unsubscribe in one click. Privacy.

Bellaire Boulevard Turn Lanes at SH 99 is a Renovation/Alteration project located at Bellaire Boulevard at SH 99, Richmond, TX 77406 in Richmond, Texas. The project has an estimated value of $68K covering 9,150 sq ft. Fort Bend County is the property owner and KCI Technology, Inc is the design firm of record. The project was registered with TDLR on May 12, 2022.

Frequently Asked Questions

What is Bellaire Boulevard Turn Lanes at SH 99?

Bellaire Boulevard Turn Lanes at SH 99 is a renovation/alteration project at Bellaire Boulevard at SH 99 in Richmond, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Widening of Bellaire Blvd to provide a right turn lane; Replace existing sidewalk and pedestrian call button; provide new sidewalk from Parkway Lake Court to Misty Morning Trace on south side of Bellaire Blvd.

Is Bellaire Boulevard Turn Lanes at SH 99 open in Richmond?

Bellaire Boulevard Turn Lanes at SH 99 was scheduled to finish construction in Jan 2023 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Bellaire Boulevard Turn Lanes at SH 99 located?

Bellaire Boulevard Turn Lanes at SH 99 is located at Bellaire Boulevard at SH 99, Richmond, TX, 77406, in Fort Bend County.

Who is the owner or developer of Bellaire Boulevard Turn Lanes at SH 99?

Fort Bend County is the property owner/developer of record for Bellaire Boulevard Turn Lanes at SH 99, per its TDLR project registration.

Who is the architect or design firm for Bellaire Boulevard Turn Lanes at SH 99?

KCI Technology, Inc is the design firm of record for Bellaire Boulevard Turn Lanes at SH 99, according to its TDLR filing.

How much does Bellaire Boulevard Turn Lanes at SH 99 cost and how big is it?

Bellaire Boulevard Turn Lanes at SH 99 has an estimated construction value of $68K and approximately 9,150 square feet (about $7/sqft), based on its TDLR filing.

Scope of Work

Widening of Bellaire Blvd to provide a right turn lane; Replace existing sidewalk and pedestrian call button; provide new sidewalk from Parkway Lake Court to Misty Morning Trace on south side of Bellaire Blvd.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Bellaire Boulevard at SH 99, Richmond, TX, 77406

Location by street address

Watch all construction in 77406 (Richmond)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Richmond?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.