Project intelligenceTDLR TABS2022020598New Construction
Funding type

This project is privately funded, on private land for private use.

m(odm) Office

900 S 1st St., Unit 100, Austin, TX, 78704

Target date passed (Aug 2022)Review Complete

m(odm) Office is a new construction project at 900 S 1st St., Unit 100, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2022 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $250K across about 3,090 sq ft.

Estimated project value
$250K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,090 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$81/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 1, 202261 days across supplied datesAug 1, 2022

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    2 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    59 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78704 (Austin)

One email per change. Unsubscribe in one click. Privacy.

m(odm) Office is a New Construction project located at 900 S 1st St., Unit 100, Austin, TX 78704 in Austin, Texas. The project has an estimated value of $250K covering 3,090 sq ft. SB Frank Commercial, LLC is the property owner and Mark Odom Studio, LLC is the design firm of record. The project was registered with TDLR on June 3, 2022.

Frequently Asked Questions

What is m(odm) Office?

m(odm) Office is a new construction project at 900 S 1st St., Unit 100 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing cold shell for admin/business occupancy. Architectural firm with new kitchenette and single user restroom.

Is m(odm) Office open in Austin?

m(odm) Office was scheduled to finish construction in Aug 2022 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is m(odm) Office located?

m(odm) Office is located at 900 S 1st St., Unit 100, Austin, TX, 78704, in Travis County.

Who is the owner or developer of m(odm) Office?

SB Frank Commercial, LLC is the property owner/developer of record for m(odm) Office, per its TDLR project registration.

Who is the architect or design firm for m(odm) Office?

Mark Odom Studio, LLC is the design firm of record for m(odm) Office, according to its TDLR filing.

How much does m(odm) Office cost and how big is it?

m(odm) Office has an estimated construction value of $250K and approximately 3,090 square feet (about $81/sqft), based on its TDLR filing.

Scope of Work

Remodel of existing cold shell for admin/business occupancy. Architectural firm with new kitchenette and single user restroom.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

900 S 1st St., Unit 100, Austin, TX, 78704

Location by street address

Related Projects

Same Design Firm

$136.3M total

Related City Permits

Building permits found at or near this location

9007 FROSTWOOD TRL

Replacement of complete existing central heat and air system with or without duct work Unrath

ActiveMechanical PermitChange OutOct 2026
View Details
2026-129339 MP
TEMPERATURE PRO ROUND ROCK
900 S 2ND ST BLDG 8

Installing circuit for EV charging.

ActiveElectrical PermitRepairOct 2026
View Details
2026-130269 EP
Texas Strong Electric LLC
900 EAST LESLIE CIR

Replacement of complete existing central heat and air system with or without duct work Change out - 3 Ton A/C system complete

ActiveMechanical PermitChange OutOct 2026
View Details
2026-128181 MP
AP Mechanical
9001 STAMBOURNE ST

Express: Foundation repair - install 22 piers to stabilize foundation

ActiveBuilding PermitRepairOct 2026
$1
View Details
2026-129216 BP
Next Level Foundation and Driveway Solutions, LLC
9004 COLLINGWOOD DR

UPGRADE MAIN ELECTROICAL SERVICE

FinalElectrical PermitUpgradeSep 2026
View Details
2026-122175 EP
Triangle Electrical Contractors

Watch all construction in 78704 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.