Project intelligenceTDLR TABS2022021643New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Pedestrian Sidewalk Improvements in Dickinson, TX

Various Locations, Dickinson, TX, 77539

Construction complete · May 2024Project Closed

Pedestrian Sidewalk Improvements is a new construction project at Various Locations, Dickinson, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2024). The project has an estimated value of $4.3M across about 194,452 sq ft.

Estimated project value
$4.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
194,452 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$22/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 16, 2022685 days across supplied datesMay 1, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    77 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    608 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77539 (Dickinson)

One email per change. Unsubscribe in one click. Privacy.

Pedestrian Sidewalk Improvements is a New Construction project located at Various Locations, Dickinson, TX 77539 in Dickinson, Texas. The project has an estimated value of $4.3M covering 194,452 sq ft. TxDOT District : Houston is the property owner and CP&Y, Inc. is the design firm of record. The project was registered with TDLR on June 16, 2022.

Frequently Asked Questions

What is Pedestrian Sidewalk Improvements?

Pedestrian Sidewalk Improvements is a new construction project at Various Locations in Dickinson, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: For the construction of 5' - 6' side walks, driveways, and curb ramp work along SH 3, FM 517, FM 1765 , and Hughes Road.

Is Pedestrian Sidewalk Improvements open in Dickinson?

Construction on Pedestrian Sidewalk Improvements is complete — TDLR records show the project passed its required accessibility inspection in May 2024. The building is finished and very likely open.

Where is Pedestrian Sidewalk Improvements located?

Pedestrian Sidewalk Improvements is located at Various Locations, Dickinson, TX, 77539, in Galveston County.

Who is the owner or developer of Pedestrian Sidewalk Improvements?

TxDOT District : Houston is the property owner/developer of record for Pedestrian Sidewalk Improvements, per its TDLR project registration.

Who is the architect or design firm for Pedestrian Sidewalk Improvements?

CP&Y, Inc. is the design firm of record for Pedestrian Sidewalk Improvements, according to its TDLR filing.

How much does Pedestrian Sidewalk Improvements cost and how big is it?

Pedestrian Sidewalk Improvements has an estimated construction value of $4.3M and approximately 194,452 square feet (about $22/sqft), based on its TDLR filing.

Scope of Work

For the construction of 5' - 6' side walks, driveways, and curb ramp work along SH 3, FM 517, FM 1765 , and Hughes Road.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Various Locations, Dickinson, TX, 77539

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77539 (Dickinson)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Dickinson?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.