Project intelligenceTDLR TABS2022023047New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

BP1907 RIVERSIDE HS CTE ADDITIONS AND RENOVATIONS in El Paso, TX

301 MIDWAY DRIVE, El Paso, TX, 79915

Construction complete · Dec 2023Project Closed

BP1907 RIVERSIDE HS CTE ADDITIONS AND RENOVATIONS is a new construction project at 301 MIDWAY DRIVE, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2023). The project has an estimated value of $22.0M across about 72,435 sq ft.

Estimated project value
$22.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
72,435 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$304/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 6, 2022530 days across supplied datesDec 18, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    50 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    480 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79915 (El Paso)

One email per change. Unsubscribe in one click. Privacy.

BP1907 RIVERSIDE HS CTE ADDITIONS AND RENOVATIONS is a New Construction project located at 301 MIDWAY DRIVE, El Paso, TX 79915 in El Paso, Texas. The project has an estimated value of $22.0M covering 72,435 sq ft. YSLETA INDEPENDENT SCHOOL DISTRICT is the property owner. The project was registered with TDLR on July 6, 2022.

Frequently Asked Questions

What is BP1907 RIVERSIDE HS CTE ADDITIONS AND RENOVATIONS?

BP1907 RIVERSIDE HS CTE ADDITIONS AND RENOVATIONS is a new construction project at 301 MIDWAY DRIVE in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: NEW 35,550 S.F. SINGLE STORY BUILDING (BUILDING "C") FOR THE YISD CAREER AND TECHNICAL EDUCATION (CTE) PROGRAMS and RENOVATIONS TO EXISTING 36,885.00 S.F. BUILDING (BUILDING "D") HOUSING EXISTING YISD CAREER AND TECHNICAL EDUCATION (CTE)…

Is BP1907 RIVERSIDE HS CTE ADDITIONS AND RENOVATIONS open in El Paso?

Construction on BP1907 RIVERSIDE HS CTE ADDITIONS AND RENOVATIONS is complete — TDLR records show the project passed its required accessibility inspection in Dec 2023. The building is finished and very likely open.

Where is BP1907 RIVERSIDE HS CTE ADDITIONS AND RENOVATIONS located?

BP1907 RIVERSIDE HS CTE ADDITIONS AND RENOVATIONS is located at 301 MIDWAY DRIVE, El Paso, TX, 79915, in El Paso County.

Who is the owner or developer of BP1907 RIVERSIDE HS CTE ADDITIONS AND RENOVATIONS?

YSLETA INDEPENDENT SCHOOL DISTRICT is the property owner/developer of record for BP1907 RIVERSIDE HS CTE ADDITIONS AND RENOVATIONS, per its TDLR project registration.

How much does BP1907 RIVERSIDE HS CTE ADDITIONS AND RENOVATIONS cost and how big is it?

BP1907 RIVERSIDE HS CTE ADDITIONS AND RENOVATIONS has an estimated construction value of $22.0M and approximately 72,435 square feet (about $304/sqft), based on its TDLR filing.

Scope of Work

NEW 35,550 S.F. SINGLE STORY BUILDING (BUILDING "C") FOR THE YISD CAREER AND TECHNICAL EDUCATION (CTE) PROGRAMS and RENOVATIONS TO EXISTING 36,885.00 S.F. BUILDING (BUILDING "D") HOUSING EXISTING YISD CAREER AND TECHNICAL EDUCATION (CTE) PROGRAMS.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

301 MIDWAY DRIVE, El Paso, TX, 79915

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 79915 (El Paso)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.