Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Railroad Buffer Phase 2 in Arlington, TX
Prairie Crest Ln and Spotted Fawn Dr., Arlington, TX, 76005
Railroad Buffer Phase 2 is a new construction project at Prairie Crest Ln and Spotted Fawn Dr., Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2023 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.0M across about 924,000 sq ft.
- Estimated project value
- $1.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 924,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 7 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
109 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
212 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76005 (Arlington)
One email per change. Unsubscribe in one click. Privacy.
Railroad Buffer Phase 2 is a New Construction project located at Prairie Crest Ln and Spotted Fawn Dr., Arlington, TX 76005 in Arlington, Texas. The project has an estimated value of $1.0M covering 924,000 sq ft. Viridian Holdings LP is the property owner and Resource Environmental Solutions (RES) is the design firm of record. The project was registered with TDLR on July 15, 2022.
Frequently Asked Questions
What is Railroad Buffer Phase 2?
Railroad Buffer Phase 2 is a new construction project at Prairie Crest Ln and Spotted Fawn Dr. in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project includes the construction of an 8' wide recreational concrete trail, seating areas, and landscaping including native grasses, wildfires, and trees.
Is Railroad Buffer Phase 2 open in Arlington?
Railroad Buffer Phase 2 was scheduled to finish construction in Jun 2023 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Railroad Buffer Phase 2 located?
Railroad Buffer Phase 2 is located at Prairie Crest Ln and Spotted Fawn Dr., Arlington, TX, 76005, in Tarrant County.
Who is the owner or developer of Railroad Buffer Phase 2?
Viridian Holdings LP is the property owner/developer of record for Railroad Buffer Phase 2, per its TDLR project registration.
Who is the architect or design firm for Railroad Buffer Phase 2?
Resource Environmental Solutions (RES) is the design firm of record for Railroad Buffer Phase 2, according to its TDLR filing.
How much does Railroad Buffer Phase 2 cost and how big is it?
Railroad Buffer Phase 2 has an estimated construction value of $1.0M and approximately 924,000 square feet (about $1/sqft), based on its TDLR filing.
Scope of Work
The project includes the construction of an 8' wide recreational concrete trail, seating areas, and landscaping including native grasses, wildfires, and trees.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Prairie Crest Ln and Spotted Fawn Dr., Arlington, TX, 76005
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 76005 (Arlington)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Arlington?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.