Project intelligenceTDLR TABS2022024640New Construction
Funding type

This project is privately funded, on private land for private use.

DSP Cedar Port Terminal in Baytown, TX

FM 1405 (Address to be assigned), Baytown, TX, 77520

Target date passed (Jul 2023)Review Complete

DSP Cedar Port Terminal is a new construction project at FM 1405 (Address to be assigned), Baytown, in Chambers County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2023 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $8.2M across about 164,640 sq ft.

Estimated project value
$8.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
164,640 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$50/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 26, 2022370 days across supplied datesJul 31, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    37 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    333 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77520 (Baytown)

One email per change. Unsubscribe in one click. Privacy.

DSP Cedar Port Terminal is a New Construction project located at FM 1405 (Address to be assigned), Baytown, TX 77520 in Baytown, Texas. The project has an estimated value of $8.2M covering 164,640 sq ft. Dayton Street Partners LLC is the property owner and Power Brown Architecture is the design firm of record. The project was registered with TDLR on July 26, 2022.

Frequently Asked Questions

What is DSP Cedar Port Terminal?

DSP Cedar Port Terminal is a new construction project at FM 1405 (Address to be assigned) in Baytown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Shell Freight Terminal / Distribution Center Warehouse. No Tenant / Interior Fit Out.

Is DSP Cedar Port Terminal open in Baytown?

DSP Cedar Port Terminal was scheduled to finish construction in Jul 2023 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is DSP Cedar Port Terminal located?

DSP Cedar Port Terminal is located at FM 1405 (Address to be assigned), Baytown, TX, 77520, in Chambers County.

Who is the owner or developer of DSP Cedar Port Terminal?

Dayton Street Partners LLC is the property owner/developer of record for DSP Cedar Port Terminal, per its TDLR project registration.

Who is the architect or design firm for DSP Cedar Port Terminal?

Power Brown Architecture is the design firm of record for DSP Cedar Port Terminal, according to its TDLR filing.

How much does DSP Cedar Port Terminal cost and how big is it?

DSP Cedar Port Terminal has an estimated construction value of $8.2M and approximately 164,640 square feet (about $50/sqft), based on its TDLR filing.

Scope of Work

Shell Freight Terminal / Distribution Center Warehouse. No Tenant / Interior Fit Out.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

FM 1405 (Address to be assigned), Baytown, TX, 77520

Loading location map…
29.71911, -94.54123

Watch all construction in 77520 (Baytown)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.