Project has been completed and closed
CROSSROADS LOGISTICS CENTER-PHASE 2 is a New Construction project located at 2921 E 17th St Unit B Suite 200, Austin, TX 78702 in Austin, Texas. The project has an estimated value of $16.5M covering 212,132 sq ft. HPI REAL ESTATE SERVICES & INVESTMENTS is the property owner and Method Architecture is the design firm of record. The project was registered with TDLR on July 28, 2022.
CROSSROADS LOGISTICS CENTER-PHASE 2 is a new construction project at 2921 E 17th St Unit B Suite 200, Austin, TX 78702 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: THE SCOPE OF WORK FOR THIS PROJECT CONSISTS OF A SINGLE-STORY, TILT WALL BUILDINGS LOCATED IN THE AUSTIN ETJ. BUILDINGS ARE SHELL ONLY AND HIGH-PILE READY. INTERIOR BUILD-OUT PLANS TO BE SUBMITTED SEPARATELY.
Construction on CROSSROADS LOGISTICS CENTER-PHASE 2 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2023. The building is finished and very likely open.
CROSSROADS LOGISTICS CENTER-PHASE 2 is located at 2921 E 17th St Unit B Suite 200, Austin, TX 78702, Austin, TX, 78702, in Travis County.
HPI REAL ESTATE SERVICES & INVESTMENTS is the property owner/developer of record for CROSSROADS LOGISTICS CENTER-PHASE 2, per its TDLR project registration.
Method Architecture is the design firm of record for CROSSROADS LOGISTICS CENTER-PHASE 2, according to its TDLR filing.
CROSSROADS LOGISTICS CENTER-PHASE 2 has an estimated construction value of $16.5M and approximately 212,132 square feet (about $78/sqft), based on its TDLR filing.
THE SCOPE OF WORK FOR THIS PROJECT CONSISTS OF A SINGLE-STORY, TILT WALL BUILDINGS LOCATED IN THE AUSTIN ETJ. BUILDINGS ARE SHELL ONLY AND HIGH-PILE READY. INTERIOR BUILD-OUT PLANS TO BE SUBMITTED SEPARATELY.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jul 28, 2022
Review Complete
Inspection Complete
Closed
Aug 31, 2023
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Secondary Contractor Underground Water/Wastewater & Storm Lines
Installation of Fireline + Riser
Airport Expansion Project (City-Funded) 2 Phase Construction- (Phase 1) Construction of the first portion (south half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage as well as a toll plaza and pedestrian bridge Parking garage sf: 1336490 sf; toll plaza sf: 2928 sf; pedestrian bridge sf: 2335 sf. (Phase 2) Construction of the second portion (north half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage. [Phase 1]
Airport Expansion Project (City-Funded) 2 Phase Construction- (Phase 1) Construction of the first portion (south half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage as well as a toll plaza and pedestrian bridge Parking garage sf: 1336490 sf; toll plaza sf: 2928 sf; pedestrian bridge sf: 2335 sf. (Phase 2) Construction of the second portion (north half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage. [Phase II]
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis