Lawton Dr. & Prospect St. Water Main Loop Improvements
1232 Prospect Dr., El Paso, TX, 79902
Lawton Dr. & Prospect St. Water Main Loop Improvements is a renovation/alteration project at 1232 Prospect Dr., El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2023 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $650K across about 50 sq ft.
- Estimated project value
- $650K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 50 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $13.00K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 10 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
74 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
287 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79902 (El Paso)
One email per change. Unsubscribe in one click. Privacy.
Lawton Dr. & Prospect St. Water Main Loop Improvements is a Renovation/Alteration project located at 1232 Prospect Dr., El Paso, TX 79902 in El Paso, Texas. The project has an estimated value of $650K covering 50 sq ft. El Paso Water Utilities is the property owner. The project was registered with TDLR on August 4, 2022.
Frequently Asked Questions
What is Lawton Dr. & Prospect St. Water Main Loop Improvements?
Lawton Dr. & Prospect St. Water Main Loop Improvements is a renovation/alteration project at 1232 Prospect Dr. in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalk ADA Ramp removal and replacement due to the installation of a new 8-inch water main.
Is Lawton Dr. & Prospect St. Water Main Loop Improvements open in El Paso?
Lawton Dr. & Prospect St. Water Main Loop Improvements was scheduled to finish construction in Jul 2023 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Lawton Dr. & Prospect St. Water Main Loop Improvements located?
Lawton Dr. & Prospect St. Water Main Loop Improvements is located at 1232 Prospect Dr., El Paso, TX, 79902, in El Paso County.
Who is the owner or developer of Lawton Dr. & Prospect St. Water Main Loop Improvements?
El Paso Water Utilities is the property owner/developer of record for Lawton Dr. & Prospect St. Water Main Loop Improvements, per its TDLR project registration.
How much does Lawton Dr. & Prospect St. Water Main Loop Improvements cost and how big is it?
Lawton Dr. & Prospect St. Water Main Loop Improvements has an estimated construction value of $650K and approximately 50 square feet (about $13.00K/sqft), based on its TDLR filing.
Scope of Work
Sidewalk ADA Ramp removal and replacement due to the installation of a new 8-inch water main.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1232 Prospect Dr., El Paso, TX, 79902
Related Projects
Watch all construction in 79902 (El Paso)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in El Paso?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.