Alo - Domain Mall
Alo - Domain Mall is a renovation/alteration project at 11410 Century Oaks Terrace, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2023). The project has an estimated value of $2.1M across about 5,000 sq ft.
๐Project Metrics
TDLR #TABS2022025470Project Closed
Project has been completed and closed
Alo - Domain Mall is a Renovation/Alteration project located at 11410 Century Oaks Terrace, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $2.1M covering 5,000 sq ft. Domain Mall, LLC is the property owner. The project was registered with TDLR on August 5, 2022.
โFrequently Asked Questions
What is Alo - Domain Mall?
Alo - Domain Mall is a renovation/alteration project at 11410 Century Oaks Terrace in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant improvements to the demised space in exterior mall building for retail use, including interior work and new storefront and finish, with no change to the use group or occupancy or egress.
Is Alo - Domain Mall open in Austin?
Construction on Alo - Domain Mall is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2023. The building is finished and very likely open.
Where is Alo - Domain Mall located?
Alo - Domain Mall is located at 11410 Century Oaks Terrace, Austin, TX, 78758, in Travis County.
Who is the owner or developer of Alo - Domain Mall?
Domain Mall, LLC is the property owner/developer of record for Alo - Domain Mall, per its TDLR project registration.
How much does Alo - Domain Mall cost and how big is it?
Alo - Domain Mall has an estimated construction value of $2.1M and approximately 5,000 square feet (about $430/sqft), based on its TDLR filing.
๐Scope of Work
Tenant improvements to the demised space in exterior mall building for retail use, including interior work and new storefront and finish, with no change to the use group or occupancy or egress.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 5, 2022
Review Complete
Inspection Complete
Closed
Apr 3, 2023
๐Related Projects
๐คSame Owner
$14.5M total๐Related City Permits
Building permits found at or near this location
7 DAY - INTERIOR REMODEL FLOORS 1 & 2 TO RETURN TO SHELL AND ADD NEW ELEVATOR PIT 1ST FLOOR AND PARTIAL 2ND FLOOR DEMO TO ALLOW FOR FUTURE ELEVATOR SHAFT AT A CURRENTLY USED PERSONAL SERVICE SPACE - OVA
Install new RPZ by the water heater for the syrup station
28613 Illuminated Wall Logo
7 DAY - Change of use and interior remodel to existing suite - OVA
7 DAY - Change of use and interior remodel to existing suite - OVA