onTrac
onTrac is a renovation/alteration project at 17670 FOUR OAKS LN STE 200, Schertz, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2023). The project has an estimated value of $460K across about 104,318 sq ft.
๐Project Metrics
TDLR #TABS2022025490Project Closed
Project has been completed and closed
onTrac is a Renovation/Alteration project located at 17670 FOUR OAKS LN STE 200, Schertz, TX 77002 in Schertz, Texas. The project has an estimated value of $460K covering 104,318 sq ft. Phelan Development is the property owner and Loe Ortega Architecture is the design firm of record. The project was registered with TDLR on August 5, 2022.
โFrequently Asked Questions
What is onTrac?
onTrac is a renovation/alteration project at 17670 FOUR OAKS LN STE 200 in Schertz, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Buildout in an existing shell building
Is onTrac open in Schertz?
Construction on onTrac is complete โ TDLR records show the project passed its required accessibility inspection in May 2023. The building is finished and very likely open.
Where is onTrac located?
onTrac is located at 17670 FOUR OAKS LN STE 200, Schertz, TX, 77002, in Bexar County.
Who is the owner or developer of onTrac?
Phelan Development is the property owner/developer of record for onTrac, per its TDLR project registration.
Who is the architect or design firm for onTrac?
Loe Ortega Architecture is the design firm of record for onTrac, according to its TDLR filing.
How much does onTrac cost and how big is it?
onTrac has an estimated construction value of $460K and approximately 104,318 square feet (about $4/sqft), based on its TDLR filing.
๐Scope of Work
Interior Buildout in an existing shell building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 5, 2022
Review Complete
Inspection Complete
Closed
May 31, 2023