2021 Klein ISD Turf Conversion
2021 Klein ISD Turf Conversion is a renovation/alteration project at 11400 Misty Valley Dr., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2023). The project has an estimated value of $3.2M across about 176,976 sq ft.
๐Project Metrics
TDLR #TABS2022025720Project Closed
Project has been completed and closed
2021 Klein ISD Turf Conversion is a Renovation/Alteration project located at 11400 Misty Valley Dr., Houston, TX 77066 in Houston, Texas. The project has an estimated value of $3.2M covering 176,976 sq ft. Klein ISD is the property owner and IBI Group is the design firm of record. The project was registered with TDLR on August 9, 2022.
โFrequently Asked Questions
What is 2021 Klein ISD Turf Conversion?
2021 Klein ISD Turf Conversion is a renovation/alteration project at 11400 Misty Valley Dr. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to existing baseball fields and existing softball fields. Scope includes removal of existing field and installation of new artificial turf at two fields, replacement of entire outfield fencing, construction of new dugouts, conโฆ
Is 2021 Klein ISD Turf Conversion open in Houston?
Construction on 2021 Klein ISD Turf Conversion is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2023. The building is finished and very likely open.
Where is 2021 Klein ISD Turf Conversion located?
2021 Klein ISD Turf Conversion is located at 11400 Misty Valley Dr., Houston, TX, 77066, in Harris County.
Who is the owner or developer of 2021 Klein ISD Turf Conversion?
Klein ISD is the property owner/developer of record for 2021 Klein ISD Turf Conversion, per its TDLR project registration.
Who is the architect or design firm for 2021 Klein ISD Turf Conversion?
IBI Group is the design firm of record for 2021 Klein ISD Turf Conversion, according to its TDLR filing.
How much does 2021 Klein ISD Turf Conversion cost and how big is it?
2021 Klein ISD Turf Conversion has an estimated construction value of $3.2M and approximately 176,976 square feet (about $18/sqft), based on its TDLR filing.
๐Scope of Work
Renovation to existing baseball fields and existing softball fields. Scope includes removal of existing field and installation of new artificial turf at two fields, replacement of entire outfield fencing, construction of new dugouts, construction of
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 9, 2022
Review Complete
Inspection Complete
Closed
Dec 15, 2023