Project intelligenceTDLR TABS2022026323New Construction
Funding type

This project is privately funded, on private land for private use.

Airport Trade Center - Building C in Mckinney, TX

1901 FM 546, Mckinney, TX, 75069

Target date passed (Dec 2025)Review Complete

Airport Trade Center - Building C is a new construction project at 1901 FM 546, Mckinney, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $17.0M across about 277,700 sq ft.

Estimated project value
$17.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
277,700 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$61/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 16, 20221,233 days across supplied datesDec 31, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    106 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,127 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75069 (Mckinney)

One email per change. Unsubscribe in one click. Privacy.

Airport Trade Center - Building C is a New Construction project located at 1901 FM 546, Mckinney, TX 75069 in Mckinney, Texas. The project has an estimated value of $17.0M covering 277,700 sq ft. McKinney Airport Property Owner, LLC is the property owner and 5G Studio Collaborative - Industrial is the design firm of record. The project was registered with TDLR on August 16, 2022.

Frequently Asked Questions

What is Airport Trade Center - Building C?

Airport Trade Center - Building C is a new construction project at 1901 FM 546 in Mckinney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New ground up core and shell warehouse distribution facility

Is Airport Trade Center - Building C open in Mckinney?

Airport Trade Center - Building C was scheduled to finish construction in Dec 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Airport Trade Center - Building C located?

Airport Trade Center - Building C is located at 1901 FM 546, Mckinney, TX, 75069, in Collin County.

Who is the owner or developer of Airport Trade Center - Building C?

McKinney Airport Property Owner, LLC is the property owner/developer of record for Airport Trade Center - Building C, per its TDLR project registration.

Who is the architect or design firm for Airport Trade Center - Building C?

5G Studio Collaborative - Industrial is the design firm of record for Airport Trade Center - Building C, according to its TDLR filing.

How much does Airport Trade Center - Building C cost and how big is it?

Airport Trade Center - Building C has an estimated construction value of $17.0M and approximately 277,700 square feet (about $61/sqft), based on its TDLR filing.

Scope of Work

New ground up core and shell warehouse distribution facility

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1901 FM 546, Mckinney, TX, 75069

Location by street address

Watch all construction in 75069 (Mckinney)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mckinney?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.