Project intelligenceTDLR TABS2022026546New Construction
Funding type

This project is privately funded, on private land for private use.

Muenster Memorial Hospital Laboratory Location

605 N Maple Street, Muenster, TX, 76252

Target date passed (Dec 2022)Project Registered

Muenster Memorial Hospital Laboratory Location is a new construction project at 605 N Maple Street, Muenster, in Cooke County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2022 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $261K across about 610 sq ft.

Estimated project value
$261K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
610 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$428/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 19, 2022134 days across supplied datesDec 31, 2022

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    43 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    91 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76252 (Muenster)

One email per change. Unsubscribe in one click. Privacy.

Muenster Memorial Hospital Laboratory Location is a New Construction project located at 605 N Maple Street, Muenster, TX 76252 in Muenster, Texas. The project has an estimated value of $261K covering 610 sq ft. Muenster Memorial Hospital is the property owner and Covenant Architecture is the design firm of record. The project was registered with TDLR on August 19, 2022.

Frequently Asked Questions

What is Muenster Memorial Hospital Laboratory Location?

Muenster Memorial Hospital Laboratory Location is a new construction project at 605 N Maple Street in Muenster, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Finish out of a new laboratory space within an existing hospital

Is Muenster Memorial Hospital Laboratory Location open in Muenster?

Muenster Memorial Hospital Laboratory Location was scheduled to finish construction in Dec 2022 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Muenster Memorial Hospital Laboratory Location located?

Muenster Memorial Hospital Laboratory Location is located at 605 N Maple Street, Muenster, TX, 76252, in Cooke County.

Who is the owner or developer of Muenster Memorial Hospital Laboratory Location?

Muenster Memorial Hospital is the property owner/developer of record for Muenster Memorial Hospital Laboratory Location, per its TDLR project registration.

Who is the architect or design firm for Muenster Memorial Hospital Laboratory Location?

Covenant Architecture is the design firm of record for Muenster Memorial Hospital Laboratory Location, according to its TDLR filing.

How much does Muenster Memorial Hospital Laboratory Location cost and how big is it?

Muenster Memorial Hospital Laboratory Location has an estimated construction value of $261K and approximately 610 square feet (about $428/sqft), based on its TDLR filing.

Scope of Work

Finish out of a new laboratory space within an existing hospital

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

605 N Maple Street, Muenster, TX, 76252

Loading location map…
33.65471, -97.37991

Watch all construction in 76252 (Muenster)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Muenster?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.