KFC
KFC is a renovation/alteration project at 3806 Main Street, The Colony, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2022). The project has an estimated value of $250K across about 2,900 sq ft.
๐Project Metrics
TDLR #TABS2022027226Project Closed
Project has been completed and closed
KFC is a Renovation/Alteration project located at 3806 Main Street, The Colony, TX 75056 in The Colony, Texas. The project has an estimated value of $250K covering 2,900 sq ft. ABRE Holdings is the property owner and Base Brand Studios a division of Jefferson Architecture is the design firm of record. The project was registered with TDLR on August 27, 2022.
โFrequently Asked Questions
What is KFC?
KFC is a renovation/alteration project at 3806 Main Street in The Colony, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Existing Chicken Express fast food restaurant, now converting restaurant to a KFC.
Is KFC open in The Colony?
Construction on KFC is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2022. The building is finished and very likely open.
Where is KFC located?
KFC is located at 3806 Main Street, The Colony, TX, 75056, in Denton County.
Who is the owner or developer of KFC?
ABRE Holdings is the property owner/developer of record for KFC, per its TDLR project registration.
Who is the architect or design firm for KFC?
Base Brand Studios a division of Jefferson Architecture is the design firm of record for KFC, according to its TDLR filing.
How much does KFC cost and how big is it?
KFC has an estimated construction value of $250K and approximately 2,900 square feet (about $86/sqft), based on its TDLR filing.
๐Scope of Work
Existing Chicken Express fast food restaurant, now converting restaurant to a KFC.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 27, 2022
Review Complete
Inspection Complete
Closed
Dec 16, 2022