Project intelligenceTDLR TABS2023001462New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Douglass ISD Gymnasium/Auditorium and Classroom Addition

20712 South FM 225, Douglass, TX, 75943

Construction complete · Nov 2024Project Closed

Douglass ISD Gymnasium/Auditorium and Classroom Addition is a new construction project at 20712 South FM 225, Douglass, in Nacogdoches County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2024). The project has an estimated value of $12.0M across about 47,880 sq ft.

Estimated project value
$12.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
47,880 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$251/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 years
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 21, 2022772 days across supplied datesNov 1, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    41 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    731 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75943 (Douglass)

One email per change. Unsubscribe in one click. Privacy.

Douglass ISD Gymnasium/Auditorium and Classroom Addition is a New Construction project located at 20712 South FM 225, Douglass, TX 75943 in Douglass, Texas. The project has an estimated value of $12.0M covering 47,880 sq ft. Douglass ISD is the property owner and McKinley-Golden Associates is the design firm of record. The project was registered with TDLR on September 21, 2022.

Frequently Asked Questions

What is Douglass ISD Gymnasium/Auditorium and Classroom Addition?

Douglass ISD Gymnasium/Auditorium and Classroom Addition is a new construction project at 20712 South FM 225 in Douglass, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New gym with locker rooms, restrooms, 9 classrooms, theatrical platform, renovation of two classrooms and Administrative offices, and new parking.

Is Douglass ISD Gymnasium/Auditorium and Classroom Addition open in Douglass?

Construction on Douglass ISD Gymnasium/Auditorium and Classroom Addition is complete — TDLR records show the project passed its required accessibility inspection in Nov 2024. The building is finished and very likely open.

Where is Douglass ISD Gymnasium/Auditorium and Classroom Addition located?

Douglass ISD Gymnasium/Auditorium and Classroom Addition is located at 20712 South FM 225, Douglass, TX, 75943, in Nacogdoches County.

Who is the owner or developer of Douglass ISD Gymnasium/Auditorium and Classroom Addition?

Douglass ISD is the property owner/developer of record for Douglass ISD Gymnasium/Auditorium and Classroom Addition, per its TDLR project registration.

Who is the architect or design firm for Douglass ISD Gymnasium/Auditorium and Classroom Addition?

McKinley-Golden Associates is the design firm of record for Douglass ISD Gymnasium/Auditorium and Classroom Addition, according to its TDLR filing.

How much does Douglass ISD Gymnasium/Auditorium and Classroom Addition cost and how big is it?

Douglass ISD Gymnasium/Auditorium and Classroom Addition has an estimated construction value of $12.0M and approximately 47,880 square feet (about $251/sqft), based on its TDLR filing.

Scope of Work

New gym with locker rooms, restrooms, 9 classrooms, theatrical platform, renovation of two classrooms and Administrative offices, and new parking.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

20712 South FM 225, Douglass, TX, 75943

31.65865, -94.88358

Watch all construction in 75943 (Douglass)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Douglass?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.