Funding type
This project is privately funded, on private land for private use.
Jovie
1931 LOHMAN'S CROSSING ROAD, Lakeway, TX, 78734
Jovie is a new construction project at 1931 LOHMAN'S CROSSING ROAD, Lakeway, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $32.5M across about 276,849 sq ft.
- Estimated project value
- $32.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 276,849 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $117/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 7mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
90 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
921 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78734 (Lakeway)
One email per change. Unsubscribe in one click. Privacy.
Jovie is a New Construction project located at 1931 LOHMAN'S CROSSING ROAD, Lakeway, TX 78734 in Lakeway, Texas. The project has an estimated value of $32.5M covering 276,849 sq ft. Jovie Lakeway LP is the property owner. The project was registered with TDLR on October 4, 2022.
Frequently Asked Questions
What is Jovie?
Jovie is a new construction project at 1931 LOHMAN'S CROSSING ROAD in Lakeway, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 5 Story, 210 Unit Multifamily Building
Is Jovie open in Lakeway?
Jovie was scheduled to finish construction in Jul 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Jovie located?
Jovie is located at 1931 LOHMAN'S CROSSING ROAD, Lakeway, TX, 78734, in Travis County.
Who is the owner or developer of Jovie?
Jovie Lakeway LP is the property owner/developer of record for Jovie, per its TDLR project registration.
How much does Jovie cost and how big is it?
Jovie has an estimated construction value of $32.5M and approximately 276,849 square feet (about $117/sqft), based on its TDLR filing.
Scope of Work
5 Story, 210 Unit Multifamily Building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1931 LOHMAN'S CROSSING ROAD, Lakeway, TX, 78734
Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Install replacement of 2 Ton Heat Pump System; Install Zone Bypass Damper; & Install Or Replace Zone Control Board
Change of use 2170 sf tenant space in 14400 sf building-no scope of work. SPE Approved. Occupancy confirmed with Farhanna Biswas Oct 17 2024
(Skinner Caleb) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
Change of use 2170 sf tenant space in 14400 sf building-no scope of work. SPE Approved. Occupancy confirmed with Farhanna Biswas Oct 17 2024
Change of use 2170 sf tenant space in 14400 sf building-no scope of work. SPE Approved. Occupancy confirmed with Farhanna Biswas Oct 17 2024
Watch all construction in 78734 (Lakeway)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Lakeway?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.