AMAT B37 Workcenter Phase 4 Fit-Up
AMAT B37 Workcenter Phase 4 Fit-Up is a renovation/alteration project at 9700 US 290, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2022). The project has an estimated value of $155K across about 45,500 sq ft.
๐Project Metrics
TDLR #TABS2023002410Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes โ permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78724 (Austin)
One email per change. Unsubscribe in one click. Privacy.
AMAT B37 Workcenter Phase 4 Fit-Up is a Renovation/Alteration project located at 9700 US 290, Austin, TX 78724 in Austin, Texas. The project has an estimated value of $155K covering 45,500 sq ft. Applied Materials is the property owner and Fuse Architecture Studio is the design firm of record. The project was registered with TDLR on October 4, 2022.
โFrequently Asked Questions
What is AMAT B37 Workcenter Phase 4 Fit-Up?
AMAT B37 Workcenter Phase 4 Fit-Up is a renovation/alteration project at 9700 US 290 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Upgrade approx. 45,500sqft of fire protection system to accommodate cartoned unexpanded Group A plastics to match the building. There are no changes to occupancy type, occupant load, or egress.
Is AMAT B37 Workcenter Phase 4 Fit-Up open in Austin?
Construction on AMAT B37 Workcenter Phase 4 Fit-Up is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2022. The building is finished and very likely open.
Where is AMAT B37 Workcenter Phase 4 Fit-Up located?
AMAT B37 Workcenter Phase 4 Fit-Up is located at 9700 US 290, Austin, TX, 78724, in Travis County.
Who is the owner or developer of AMAT B37 Workcenter Phase 4 Fit-Up?
Applied Materials is the property owner/developer of record for AMAT B37 Workcenter Phase 4 Fit-Up, per its TDLR project registration.
Who is the architect or design firm for AMAT B37 Workcenter Phase 4 Fit-Up?
Fuse Architecture Studio is the design firm of record for AMAT B37 Workcenter Phase 4 Fit-Up, according to its TDLR filing.
How much does AMAT B37 Workcenter Phase 4 Fit-Up cost and how big is it?
AMAT B37 Workcenter Phase 4 Fit-Up has an estimated construction value of $155K and approximately 45,500 square feet (about $3/sqft), based on its TDLR filing.
๐Scope of Work
Upgrade approx. 45,500sqft of fire protection system to accommodate cartoned unexpanded Group A plastics to match the building. There are no changes to occupancy type, occupant load, or egress.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 4, 2022
Review Complete
Inspection Complete
Closed
Nov 11, 2022
๐Related Projects
๐คSame Owner
$9.6M total๐Related City Permits
Building permits found at or near this location
Interior remodel to existing warehouse B37 Restrooms
Interior remodel to existing warehouse B37 Restrooms
Interior remodel to existing warehouse B37 Restrooms
Interior remodel to existing warehouse B37 Restrooms
Interior remodel 2nd floor areas at existing manufacturing facility- Etch Paros
Property Owner
Design Firm
Registered Accessibility Specialist
Travis County Economy
Explore Area
Watch all construction in 78724 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.