STOP N BYE
STOP N BYE is a renovation/alteration project at 3100 HIGHWAY 36 SOUTH, Brenham, in Washington County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $100K across about 7,643 sq ft.
๐Project Metrics
TDLR #TABS2023004077Review Complete
Design review complete, construction may proceed
STOP N BYE is a Renovation/Alteration project located at 3100 HIGHWAY 36 SOUTH, Brenham, TX 77833 in Brenham, Texas. The project has an estimated value of $100K covering 7,643 sq ft. ANISH INVESTMENT INC is the property owner and AMC DESIGN is the design firm of record. The project was registered with TDLR on October 27, 2022.
โFrequently Asked Questions
What is STOP N BYE?
STOP N BYE is a renovation/alteration project at 3100 HIGHWAY 36 SOUTH in Brenham, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: EXPANSION OF EXISTING GAS STATION/CONVINIENCE STORE, SHIFTING EVERYTHING OVER TO CREATE MORE RETAIL FLOOR.
Is STOP N BYE open in Brenham?
STOP N BYE is currently under construction in Brenham, TX. Its current TDLR status is "Review Complete".
Where is STOP N BYE located?
STOP N BYE is located at 3100 HIGHWAY 36 SOUTH, Brenham, TX, 77833, in Washington County.
Who is the owner or developer of STOP N BYE?
ANISH INVESTMENT INC is the property owner/developer of record for STOP N BYE, per its TDLR project registration.
Who is the architect or design firm for STOP N BYE?
AMC DESIGN is the design firm of record for STOP N BYE, according to its TDLR filing.
How much does STOP N BYE cost and how big is it?
STOP N BYE has an estimated construction value of $100K and approximately 7,643 square feet (about $13/sqft), based on its TDLR filing.
๐Scope of Work
EXPANSION OF EXISTING GAS STATION/CONVINIENCE STORE, SHIFTING EVERYTHING OVER TO CREATE MORE RETAIL FLOOR.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 27, 2022
Review Complete
Oct 27, 2022
Inspection Complete
Closed