Project intelligenceTDLR TABS2023004746Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Valero #40538 Tank Replacement

1300 E Gibbs St, Del Rio, TX, 78840

Construction complete · Feb 2024Project Closed

Valero #40538 Tank Replacement is a renovation/alteration project at 1300 E Gibbs St, Del Rio, in Val Verde County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2024). The project has an estimated value of $350K across about 7,780 sq ft.

Estimated project value
$350K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
7,780 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$45/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 4, 2022469 days across supplied datesFeb 16, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    423 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    46 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

📰About Valero #40538 Tank Replacement

The 7-Eleven at 1300 E Gibbs St in Del Rio completed a $350,000 renovation and alteration project in early 2024. This work involved the removal and replacement of existing fuel tanks, product lines, dispensers, and the store canopy. The project covered a building area of 7,780 sq ft, resulting in an estimated cost of $45 per square foot.

Core States Group served as the design firm of record for this privately funded project on private land. The filing, registered with TDLR in November 2022, specified a construction start date of January 2024 and a scheduled completion date of February 2024. The TDLR status indicates that the agency closed the project file in February 2024, marking the end of the accessibility review process for this construction.

This renovation aligns with the median estimated cost for similar renovation/alteration filings in Val Verde County, which is also $350,000. However, the project's scheduled build window of 46 days was shorter than the county median of 103 days for comparable projects. Additionally, the $45 per square foot cost was below the county median of $68 per square foot for this type of work.

The project is one of several registered accessibility projects in the area, including the Val Verde Regional Medical Center Emergency Department renovation and BlueWave Express Car Wash new construction. Ernesto Sarabia was the registered accessibility specialist associated with the filing.

Core States Group has been involved in six other TDLR-registered projects totaling $15,290,455, including locations in Denton, Brenham, Spring, Kaufman, and Portland. These projects range from small renovations to large-scale new constructions, reflecting the firm's varied portfolio in Texas. The 7-Eleven project fits within this broader context of commercial development in the state.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78840 (Del Rio)

One email per change. Unsubscribe in one click. Privacy.

Valero #40538 Tank Replacement is a Renovation/Alteration project located at 1300 E Gibbs St, Del Rio, TX 78840 in Del Rio, Texas. The project has an estimated value of $350K covering 7,780 sq ft. 7-Eleven lnc is the property owner and Core States Group is the design firm of record. The project was registered with TDLR on November 4, 2022.

Frequently Asked Questions

What work was done at the 7-Eleven in Del Rio?

The project involved removing and replacing existing tanks, product lines, and dispensers. It also included replacing the existing canopy. This was a renovation/alteration project registered with TDLR.

When did the construction finish?

The filing listed a completion date of February 2024. TDLR closed the project file in February 2024, which marks the end of the accessibility review process for this construction.

Who designed the project?

Core States Group was the design firm of record. Ernesto Sarabia was the registered accessibility specialist. The owner of record is 7-Eleven Inc.

How much did the renovation cost?

The estimated cost was $350,000. This is close to the median estimated cost for renovation/alteration filings in Val Verde County, which is also $350,000.

Is the store open?

The TDLR record confirms the construction project is closed and the review process is complete. It does not provide information about the store's current operating status or opening hours.

What is Valero #40538 Tank Replacement?

Valero #40538 Tank Replacement is a renovation/alteration project at 1300 E Gibbs St in Del Rio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remove and replace existing tanks, product lines, and dispensers. Replace existing canopy

Is Valero #40538 Tank Replacement open in Del Rio?

Construction on Valero #40538 Tank Replacement is complete — TDLR records show the project passed its required accessibility inspection in Feb 2024. The building is finished and very likely open.

Where is Valero #40538 Tank Replacement located?

Valero #40538 Tank Replacement is located at 1300 E Gibbs St, Del Rio, TX, 78840, in Val Verde County.

Who is the owner or developer of Valero #40538 Tank Replacement?

7-Eleven lnc is the property owner/developer of record for Valero #40538 Tank Replacement, per its TDLR project registration.

Who is the architect or design firm for Valero #40538 Tank Replacement?

Core States Group is the design firm of record for Valero #40538 Tank Replacement, according to its TDLR filing.

How much does Valero #40538 Tank Replacement cost and how big is it?

Valero #40538 Tank Replacement has an estimated construction value of $350K and approximately 7,780 square feet (about $45/sqft), based on its TDLR filing.

Scope of Work

Remove and replace existing tanks, product lines, and dispensers. Replace existing canopy

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1300 E Gibbs St, Del Rio, TX, 78840

29.36866, -100.88944

Watch all construction in 78840 (Del Rio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.