Project has been completed and closed
Southwest Airlines AUS Modular Building Additions is a Renovation/Alteration project located at 3600 Presidential Blvd Building 7035, Austin, TX 76108 in Austin, Texas. The project has an estimated value of $400K covering 2,304 sq ft. Department of Aviation is the property owner and Bensaer LLC is the design firm of record. The project was registered with TDLR on November 8, 2022.
Providing utilities and accessible ramp and stairs to two modular buildings on the ramp level of Austin Bergstrom International Airport
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 8, 2022
Review Complete
Inspection Complete
Closed
Feb 1, 2024
Building permits found at or near this location
Remodel of existing office spaces for tenant who is expanding into adjacent suites. Access control requested.
Construction of structural towers attached to main terminal building stairwells and light poles to allow camera installation for Virtual Ramp Control System. Work proposed in electrical rooms IT rooms etc. with new conduits/circuits (power and signal) being run from those rooms. Mechanical work proposes installation of compressor systems that go with the camera houses. These are dedicated systems that SAAB maintains and do not connect to any HVAC or other airport mechanical systems. Infrastructure (electrical =mechanical) for powering and maintaining camera systems. [Airside Permits]
Construction of structural towers attached to main terminal building stairwells and light poles to allow camera installation for Virtual Ramp Control System. Work proposed in electrical rooms IT rooms etc. with new conduits/circuits (power and signal) being run from those rooms. Mechanical work proposes installation of compressor systems that go with the camera houses. These are dedicated systems that SAAB maintains and do not connect to any HVAC or other airport mechanical systems. Infrastructure (electrical =mechanical) for powering and maintaining camera systems. [Airside Permits]
Construction of structural towers attached to main terminal building stairwells and light poles to allow camera installation for Virtual Ramp Control System. Work proposed in electrical rooms IT rooms etc. with new conduits/circuits (power and signal) being run from those rooms. Mechanical work proposes installation of compressor systems that go with the camera houses. These are dedicated systems that SAAB maintains and do not connect to any HVAC or other airport mechanical systems. Infrastructure (electrical =mechanical) for powering and maintaining camera systems. [Airside Permits]
(3600 Presidential Blvd) Interior renovations within an existing building for virtual ramp control system improvements; includes finishing of existing space (paint carpet electrical desk and monitor installation) for control room. Electrical and communications (2901 Employee Ave) Interior renovations with an existing building for virtual ramp control system improvements. Electrical and communications work proposed (3011 Employee Ave). [Control Rooms Permits]