Design review complete, construction may proceed
Southwest Airlines AUS GO Mezzanine Remodel is a Alteration/Renovation project located at 3600 Presidential Blvd., Bldg. #7035 in Austin, Texas. The project has an estimated value of $1.9M covering 6,524 sq ft. Austin Bergstrom International Airport is the property owner and Bensaer LLC is the design firm of record. The project was registered with TDLR on January 21, 2025.
Providing interior offices remodel to various spaces at AUS airport including 360 s.f. at the ramp level; 680 s.f. at the SW Ready Room and 1,100 s.f. at the Air Ticketing Office (ATO) on the Concourse level; and 4,384 s.f. at the mezzanine level.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 21, 2025
Review Complete
Jan 21, 2025
Inspection Complete
Closed
Building permits found at or near this location
Installation of Fireline + Riser
Secondary Contractor Underground Water/Wastewater & Storm Lines
Airport Expansion Project (City-Funded) 2 Phase Construction- (Phase 1) Construction of the first portion (south half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage as well as a toll plaza and pedestrian bridge Parking garage sf: 1336490 sf; toll plaza sf: 2928 sf; pedestrian bridge sf: 2335 sf. (Phase 2) Construction of the second portion (north half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage. [Phase II]
Airport Expansion Project (City-Funded) 2 Phase Construction- (Phase 1) Construction of the first portion (south half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage as well as a toll plaza and pedestrian bridge Parking garage sf: 1336490 sf; toll plaza sf: 2928 sf; pedestrian bridge sf: 2335 sf. (Phase 2) Construction of the second portion (north half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage. [Phase 1]
Airport Expansion Project (City-Funded) 2 Phase Construction- (Phase 1) Construction of the first portion (south half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage as well as a toll plaza and pedestrian bridge Parking garage sf: 1336490 sf; toll plaza sf: 2928 sf; pedestrian bridge sf: 2335 sf. (Phase 2) Construction of the second portion (north half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage. [Phase 1]