Funding type
This project is privately funded, on private land for private use.
SOUTHWEST AIRLINES WEST GATES EXPANSION OFFICE BUILDOUT
3600 Presidential Blvd., Austin, TX, 78719
SOUTHWEST AIRLINES WEST GATES EXPANSION OFFICE BUILDOUT is a renovation/alteration project at 3600 Presidential Blvd., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $978K across about 3,900 sq ft.
- Estimated project value
- $978K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 3,900 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $251/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
39 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
8 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
121 days after the preceding date shown.
Source: TDLR filing
View source record
📰About SOUTHWEST AIRLINES WEST GATES EXPANSION OFFICE BUILDOUT
Austin Bergstrom International Airport is the owner of record for a 3,900-square-foot tenant improvement project. The filing identifies the specific work as the Southwest Airlines West Gates Expansion Office Buildout. This renovation is located on the ramp level in the north west quadrant of the Westgate Terminal Expansion at 3600 Presidential Blvd., Austin, TX 78719. The space is designated for business administration and operations.
The project has an estimated cost of $978,000. This valuation equates to $251 per square foot, a figure that sits above the median cost per square foot for renovation and alteration filings in Travis County. The total estimated cost is also above the county median for similar projects, placing it in the upper range of recent accessibility registrations in the area.
Bensaer LLC is the design firm of record for this buildout. The firm has experience with airport infrastructure, including work at William P. Hobby International Airport and other commercial sites. The registered accessibility specialist for this specific TDLR filing is Melvyn Archer. The project is privately funded and situated on private land for private use, distinct from public municipal construction projects.
Construction activity began in September 2026, following the completion of plan review by TDLR in the same month. The scheduled build window spans 129 days, which is longer than the median scheduled build window of 98 days for renovation projects in Travis County. The project is scheduled to finish in January 2027, marking the end of the active construction phase for this specific tenant improvement scope.
Context and Comparisons
Austin Bergstrom International Airport has five other TDLR-registered projects on file, totaling $2,327,000 in estimated costs. These include various administrative and facility improvements at the airport. The current Southwest project is one of several concurrent or recent infrastructure updates at the facility, reflecting ongoing development within the terminal complex.
City of Austin permit records show at least 25 permits on file at this street address. Recent permits include building, electrical, plumbing, and mechanical work, with declared valuations totaling $1,850,000. These permits may relate to other tenants or suites at the same address, such as the new airline lounge mentioned in recent ePlan filings. The broader airport development includes significant finish-out work for new airline spaces, indicating a period of substantial capital investment at the site.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78719 (Austin)
One email per change. Unsubscribe in one click. Privacy.
SOUTHWEST AIRLINES WEST GATES EXPANSION OFFICE BUILDOUT is a Renovation/Alteration project located at 3600 Presidential Blvd., Austin, TX 78719 in Austin, Texas. The project has an estimated value of $978K covering 3,900 sq ft. Austin Bergstrom International Airport is the property owner and Bensaer LLC is the design firm of record. The project was registered with TDLR on July 24, 2026.
Frequently Asked Questions
What is the scope of work for this project?
The scope includes 3,900 square feet of tenant improvements for Southwest Airlines on the ramp level. The space is intended for business administration and operations within the Westgate Terminal Expansion.
Who is the design firm for this buildout?
Bensaer LLC is the design firm of record. The registered accessibility specialist is Melvyn Archer. The project is owned by Austin Bergstrom International Airport.
When is the construction scheduled to finish?
Construction started in September 2026 and is scheduled to finish in January 2027. TDLR completed plan review in September 2026.
Is Southwest Airlines open at this location?
The TDLR record details construction status, not business operations. The project is scheduled to finish in January 2027. Third-party mentions do not confirm a specific opening date for this office space.
How does the cost compare to other projects in Travis County?
The estimated cost of $978,000 is above the county median for renovation projects. The cost per square foot is $251, which is above the county median of $103.
What is SOUTHWEST AIRLINES WEST GATES EXPANSION OFFICE BUILDOUT?
SOUTHWEST AIRLINES WEST GATES EXPANSION OFFICE BUILDOUT is a renovation/alteration project at 3600 Presidential Blvd. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 3,900 SQ. FT. TENANT IMPROVEMENTS FOR SOUTHWEST AIRLINES ON THE RAMP LEVEL IN THE NORTH WEST QUADRANT OF THE WESTGATE TERMINAL EXPANSION. THE USE OF THE TENANT SPACE IS FOR BUSINESS ADMINISTRATION AND OPERATIONS
Is SOUTHWEST AIRLINES WEST GATES EXPANSION OFFICE BUILDOUT open in Austin?
SOUTHWEST AIRLINES WEST GATES EXPANSION OFFICE BUILDOUT is still under construction in Austin, TX, with an estimated completion of Jan 2027 according to its TDLR registration.
Where is SOUTHWEST AIRLINES WEST GATES EXPANSION OFFICE BUILDOUT located?
SOUTHWEST AIRLINES WEST GATES EXPANSION OFFICE BUILDOUT is located at 3600 Presidential Blvd., Austin, TX, 78719, in Travis County.
Who is the owner or developer of SOUTHWEST AIRLINES WEST GATES EXPANSION OFFICE BUILDOUT?
Austin Bergstrom International Airport is the property owner/developer of record for SOUTHWEST AIRLINES WEST GATES EXPANSION OFFICE BUILDOUT, per its TDLR project registration.
Who is the architect or design firm for SOUTHWEST AIRLINES WEST GATES EXPANSION OFFICE BUILDOUT?
Bensaer LLC is the design firm of record for SOUTHWEST AIRLINES WEST GATES EXPANSION OFFICE BUILDOUT, according to its TDLR filing.
How much does SOUTHWEST AIRLINES WEST GATES EXPANSION OFFICE BUILDOUT cost and how big is it?
SOUTHWEST AIRLINES WEST GATES EXPANSION OFFICE BUILDOUT has an estimated construction value of $978K and approximately 3,900 square feet (about $251/sqft), based on its TDLR filing.
Scope of Work
3,900 SQ. FT. TENANT IMPROVEMENTS FOR SOUTHWEST AIRLINES ON THE RAMP LEVEL IN THE NORTH WEST QUADRANT OF THE WESTGATE TERMINAL EXPANSION. THE USE OF THE TENANT SPACE IS FOR BUSINESS ADMINISTRATION AND OPERATIONS
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3600 Presidential Blvd., Austin, TX, 78719
Related Projects
Same Owner
$3.1M totalRelated City Permits
Building permits found at or near this location
ePlan: BAUS Review - Interior Remodel on Apron Level for Southwest Airlines (3900 SF).
Gregory Dentistry reverse-lit channel letter - individually mounted
ePlan: BAUS - First Time Finish out of New Airline Lounge (20500 SF)
ePlan: BAUS - First Time Finish out of New Airline Lounge (20500 SF)
ePlan: BAUS - First Time Finish out of New Airline Lounge (20500 SF)
Watch all construction in 78719 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.