Construction complete · Aug 2026Project Closed

SOUTHWEST AIRLINES RAMP BREAK ROOM AND LOCKER ROOM REMODEL is a renovation/alteration project at 7800 Airport Blvd., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $500K across about 6,898 sq ft.

Estimated project value
$500K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
6,898 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$72/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 28, 2025519 days across supplied datesAug 29, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    34 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    123 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    237 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    125 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SOUTHWEST AIRLINES RAMP BREAK ROOM AND LOCKER ROOM REMODEL

Southwest Airlines completed a $500,000 renovation of its ramp break room and locker rooms at William P. Hobby International Airport in Houston. The project involved 6,898 sq ft of interior work on the apron level, including new millwork, room finishes, and updated convenience power and lighting. The scope also covered the replacement of existing lockers and ice/water dispensers.

Houston Airport System served as the owner of record for this renovation and alteration project. Bensaer LLC was the design firm of record, and Melvyn Archer acted as the registered accessibility specialist. The work was privately funded on private land for private use, distinct from public terminal expansions.

Project Timeline and Status

The project registered with the Texas Department of Licensing and Regulation in March 2025, with plan review completing in the same month. Construction began in May 2025, and the filing indicated a scheduled completion date of September 2025. The final inspection passed in April 2026, marking the physical completion of the work.

TDLR closed the project file in August 2026, which marks the end of the accessibility review process for this construction. This closure confirms that the regulatory requirements for the renovation have been fully satisfied and the record is no longer active.

Context and Comparisons

The estimated cost of $500,000 is above the Harris County median of $250,000 for similar renovation and alteration filings. The scheduled build window of 123 days was longer than the county median of 92 days. The cost per square foot of $72 is close to the county median of $80.

Houston Airport System has six other TDLR-registered projects totaling $5,476,087, including work at George Bush Intercontinental Airport. Bensaer LLC has six other TDLR-registered projects totaling $3,495,000, with work at Austin Bergstrom International Airport and other sites. Nearby businesses include Fine Airport Parking, Avis Car Rental, and the Aviation Institute of Maintenance.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77061 (Houston)

One email per change. Unsubscribe in one click. Privacy.

SOUTHWEST AIRLINES RAMP BREAK ROOM AND LOCKER ROOM REMODEL is a Renovation/Alteration project located at 7800 Airport Blvd., Houston, TX 77061 in Houston, Texas. The project has an estimated value of $500K covering 6,898 sq ft. Houston Airport System is the property owner and Bensaer LLC is the design firm of record. The project was registered with TDLR on March 28, 2025.

Frequently Asked Questions

What was the scope of the Southwest Airlines renovation?

The work included new millwork, room finishes, convenience power, lighting improvements, and the replacement of lockers and ice/water dispensers in the ramp break room and locker rooms.

Who owned the property where the work was done?

Houston Airport System was the owner and developer of record for this project located at 7800 Airport Blvd., Houston, TX 77061.

When did the construction take place?

Construction started in May 2025. The final inspection passed in April 2026, and the TDLR project file was closed in August 2026.

Is the business open?

The TDLR record confirms the construction is complete and the project file is closed. It does not provide information regarding specific operating hours or current business status.

How much did the renovation cost?

The estimated cost for the 6,898 sq ft renovation was $500,000, which calculates to approximately $72 per square foot.

What is SOUTHWEST AIRLINES RAMP BREAK ROOM AND LOCKER ROOM REMODEL?

SOUTHWEST AIRLINES RAMP BREAK ROOM AND LOCKER ROOM REMODEL is a renovation/alteration project at 7800 Airport Blvd. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: PROVIDE NEW MILLWORK AND ROOM FINISHES IN THE RAMP BREAK ROOM AND LOCKER ROOMS ON THE APRON LEVEL OF WILLIAM P. HOBBY INTERNATIONAL AIRPORT. THE WORK ALSO INCLUDES RELATED CONVENIENCE POWER; LIGHTING IMPROVEMENTS; AND REPLACING THE LOCKE…

Is SOUTHWEST AIRLINES RAMP BREAK ROOM AND LOCKER ROOM REMODEL open in Houston?

Construction on SOUTHWEST AIRLINES RAMP BREAK ROOM AND LOCKER ROOM REMODEL is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is SOUTHWEST AIRLINES RAMP BREAK ROOM AND LOCKER ROOM REMODEL located?

SOUTHWEST AIRLINES RAMP BREAK ROOM AND LOCKER ROOM REMODEL is located at 7800 Airport Blvd., Houston, TX, 77061, in Harris County.

Who is the owner or developer of SOUTHWEST AIRLINES RAMP BREAK ROOM AND LOCKER ROOM REMODEL?

Houston Airport System is the property owner/developer of record for SOUTHWEST AIRLINES RAMP BREAK ROOM AND LOCKER ROOM REMODEL, per its TDLR project registration.

Who is the architect or design firm for SOUTHWEST AIRLINES RAMP BREAK ROOM AND LOCKER ROOM REMODEL?

Bensaer LLC is the design firm of record for SOUTHWEST AIRLINES RAMP BREAK ROOM AND LOCKER ROOM REMODEL, according to its TDLR filing.

How much does SOUTHWEST AIRLINES RAMP BREAK ROOM AND LOCKER ROOM REMODEL cost and how big is it?

SOUTHWEST AIRLINES RAMP BREAK ROOM AND LOCKER ROOM REMODEL has an estimated construction value of $500K and approximately 6,898 square feet (about $72/sqft), based on its TDLR filing.

Scope of Work

PROVIDE NEW MILLWORK AND ROOM FINISHES IN THE RAMP BREAK ROOM AND LOCKER ROOMS ON THE APRON LEVEL OF WILLIAM P. HOBBY INTERNATIONAL AIRPORT. THE WORK ALSO INCLUDES RELATED CONVENIENCE POWER; LIGHTING IMPROVEMENTS; AND REPLACING THE LOCKERS AND ICE/WA

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

7800 Airport Blvd., Houston, TX, 77061

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

7800 AIRPORT BLVD F-11, Houston, TX 77061

HEALTH REVIEW ONLY FOR BSG-2025-248-HOU

IssuedBuilding Pmt
HOU-25062551-BUILDINGPMT
7800 AIRPORT BLVD F-4, Houston, TX 77061

HEALTH REVIEW ONLY BSG-2025-185-HOU

IssuedBuilding Pmt
HOU-25050395-BUILDINGPMT

Watch all construction in 77061 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.