Southwest Airlines aus Ramp Break Room Remodel
๐Project Metrics
TDLR #TABS2022025135Project Closed
Project has been completed and closed
๐Scope of Work
THE FOLLOWING WORK IS WITHIN THE EXISTING BUILDING FOOTPRINT: DEMOLISHING ROOMS #WN 2436 AND #WN2437 AND EXPOSING 202 S.F. TO THE EXTERIOR; REMODELING 4,194 S.F. OF OFFICE AND BREAK ROOMS; EXPANDING BREAK ROOM BY 552 S.F.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$3.3M total๐Related City Permits
Building permits found at or near this location
Upgrade AT&T antenna and radio equipment on an existing cell phone facility on a rooftop.
ePlan: BAUS - Airport Project: Installation of a temporary hanging scaffold system to limit impacts to the existing bagging claim level of the AUS Barbara Jordan Terminal during construction.
Installation of Ramp Information Displays (RIDS) and Gate Information Displays (GIDS) for Southwest Airlines on the ramp level and holdrooms of gates 22 and 23. Exterior 2 locations 88 square feet; Interior 2 locations 18 square feet.
REPLACE DAMAGED SERVICE DISCONNECT
Interior Renovation of existing public restrooms within Austin-Bergstrom International Airport including selective demolition architectural finishes plumbing fixture replacement and associated electrical and plumbing work. No change of use area or building footprint.