Funding type
This project is privately funded, on private land for private use.
BNSF Hereford, TX Depot Facility
102 South Progressive Road, Hereford, TX, 79045
BNSF Hereford, TX Depot Facility is a new construction project at 102 South Progressive Road, Hereford, in Deaf Smith County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2023). The project has an estimated value of $2.0M across about 4,368 sq ft.
- Estimated project value
- $2.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 4,368 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $459/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 8 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
38 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
252 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
📰About BNSF Hereford, TX Depot Facility
The BNSF Depot Facility is a new 4,368 sq ft structure located at 102 South Progressive Road in Hereford, Deaf Smith County. Filed as the BNSF Hereford, TX Depot Facility, the project involved the construction of a pre-engineered metal building on a concrete slab. The interior includes full finish out for offices, a locker room, restrooms, and storage areas. The estimated cost for this new construction was $2,004,045.
Construction Details and Scope
The work scope focused on creating a functional workspace for railway operations. The building features a concrete slab foundation supporting the PEMB structure. Interior finishes covered the designated office space, employee locker room, restrooms, and storage zones. This configuration supports the operational needs of the facility within the local industrial corridor of Hereford. The design and construction services were provided by Touchstone Engineering and Construction Services, LLC.
Stephen D Macphie served as the registered accessibility specialist for the project. The construction timeline began in December 2022 following registration in November 2022. The scheduled build window was 252 days. This duration is close to the county median of 242 days for similar new construction filings in Deaf Smith County. The project was privately funded on private land for private use.
Project Status and Context
TDLR closed the project file in August 2023, which marks the end of the accessibility review process for this construction. The status confirms that the construction phase concluded within the scheduled timeframe. The cost per square foot was $459, which is above the county median of $305 for comparable projects. The total estimated cost of $2,004,045 is also above the county median of $1,000,000 for new construction filings in the area.
BNSF Railway has registered three other TDLR projects in Texas, all located in Haslet. These include the BNSF - Haz Pit facility, the BNSF-Hostler Building, and the BNSF - Employee Building. All three projects are closed. The Hereford facility represents a significant investment in the local infrastructure of Deaf Smith County, contributing to the commercial development of the region. The project aligns with standard construction practices for commercial facilities in the state.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79045 (Hereford)
One email per change. Unsubscribe in one click. Privacy.
BNSF Hereford, TX Depot Facility is a New Construction project located at 102 South Progressive Road, Hereford, TX 79045 in Hereford, Texas. The project has an estimated value of $2.0M covering 4,368 sq ft. BNSF Railway is the property owner and Touchstone Engineering and Construction Services, LLC is the design firm of record. The project was registered with TDLR on November 14, 2022.
Frequently Asked Questions
Is the BNSF Depot Facility in Hereford open?
The TDLR record indicates the construction project is closed. This status confirms the building work is complete, but it does not confirm the business is open to the public or operating.
What is the address of the BNSF Depot Facility?
The facility is located at 102 South Progressive Road, Hereford, TX 79045. It is situated in Deaf Smith County, Texas.
Who built the BNSF Depot Facility in Hereford?
Touchstone Engineering and Construction Services, LLC provided the design and construction services. Stephen D Macphie was the registered accessibility specialist for the project.
What was the cost of the BNSF Depot Facility project?
The estimated cost for the new construction was $2,004,045. This amounts to $459 per square foot for the 4,368 sq ft building.
When was the BNSF Depot Facility completed?
The project was registered in November 2022 and construction started in December 2022. TDLR closed the project file in August 2023, marking the end of the review process.
What is BNSF Hereford, TX Depot Facility?
BNSF Hereford, TX Depot Facility is a new construction project at 102 South Progressive Road in Hereford, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of PEMB on concrete slab with full finish out for offices, lockerroom, restrooms, and storage
Is BNSF Hereford, TX Depot Facility open in Hereford?
Construction on BNSF Hereford, TX Depot Facility is complete — TDLR records show the project passed its required accessibility inspection in Aug 2023. The building is finished and very likely open.
Where is BNSF Hereford, TX Depot Facility located?
BNSF Hereford, TX Depot Facility is located at 102 South Progressive Road, Hereford, TX, 79045, in Deaf Smith County.
Who is the owner or developer of BNSF Hereford, TX Depot Facility?
BNSF Railway is the property owner/developer of record for BNSF Hereford, TX Depot Facility, per its TDLR project registration.
Who is the architect or design firm for BNSF Hereford, TX Depot Facility?
Touchstone Engineering and Construction Services, LLC is the design firm of record for BNSF Hereford, TX Depot Facility, according to its TDLR filing.
How much does BNSF Hereford, TX Depot Facility cost and how big is it?
BNSF Hereford, TX Depot Facility has an estimated construction value of $2.0M and approximately 4,368 square feet (about $459/sqft), based on its TDLR filing.
Scope of Work
Construction of PEMB on concrete slab with full finish out for offices, lockerroom, restrooms, and storage
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
102 South Progressive Road, Hereford, TX, 79045
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 79045 (Hereford)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Hereford?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.