Project intelligenceTDLR TABS2023005781New Construction
Funding type

This project is privately funded, on private land for private use.

Sierra Vista Phase 1 Amenity Center Improvements

Crystal View Drive & C.R. 48, Iowa Colony, TX, 77583

Construction complete · May 2024Project Closed

Sierra Vista Phase 1 Amenity Center Improvements is a new construction project at Crystal View Drive & C.R. 48, Iowa Colony, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2024). The project has an estimated value of $4.2M across about 394,763 sq ft.

Estimated project value
$4.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
394,763 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$11/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 5mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 18, 2022530 days across supplied datesMay 1, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    13 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    517 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77583 (Iowa Colony)

One email per change. Unsubscribe in one click. Privacy.

Sierra Vista Phase 1 Amenity Center Improvements is a New Construction project located at Crystal View Drive & C.R. 48, Iowa Colony, TX 77583 in Iowa Colony, Texas. The project has an estimated value of $4.2M covering 394,763 sq ft. Jeff Sheehan is the property owner. The project was registered with TDLR on November 18, 2022.

Frequently Asked Questions

What is Sierra Vista Phase 1 Amenity Center Improvements?

Sierra Vista Phase 1 Amenity Center Improvements is a new construction project at Crystal View Drive & C.R. 48 in Iowa Colony, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Landscape, irrigation, walks, pool, shade structures, parking lot

Is Sierra Vista Phase 1 Amenity Center Improvements open in Iowa Colony?

Construction on Sierra Vista Phase 1 Amenity Center Improvements is complete — TDLR records show the project passed its required accessibility inspection in May 2024. The building is finished and very likely open.

Where is Sierra Vista Phase 1 Amenity Center Improvements located?

Sierra Vista Phase 1 Amenity Center Improvements is located at Crystal View Drive & C.R. 48, Iowa Colony, TX, 77583, in Brazoria County.

Who is the owner or developer of Sierra Vista Phase 1 Amenity Center Improvements?

Jeff Sheehan is the property owner/developer of record for Sierra Vista Phase 1 Amenity Center Improvements, per its TDLR project registration.

How much does Sierra Vista Phase 1 Amenity Center Improvements cost and how big is it?

Sierra Vista Phase 1 Amenity Center Improvements has an estimated construction value of $4.2M and approximately 394,763 square feet (about $11/sqft), based on its TDLR filing.

Scope of Work

Landscape, irrigation, walks, pool, shade structures, parking lot

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Crystal View Drive & C.R. 48, Iowa Colony, TX, 77583

Location by street address

Watch all construction in 77583 (Iowa Colony)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Iowa Colony?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.