Play Street Museum is a renovation/alteration project at 5601 Brodie Lane, Suite 940, Sunset Valley, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2023). The project has an estimated value of $150K across about 2,691 sq ft.
Project has been completed and closed
Play Street Museum is a Renovation/Alteration project located at 5601 Brodie Lane, Suite 940, Sunset Valley, TX 78745 in Sunset Valley, Texas. The project has an estimated value of $150K covering 2,691 sq ft. RREEF AMERICA REIT II PORTFOLIO LP is the property owner and Thorn Design is the design firm of record. The project was registered with TDLR on November 18, 2022.
Play Street Museum is a renovation/alteration project at 5601 Brodie Lane, Suite 940 in Sunset Valley, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Renovation Only
Construction on Play Street Museum is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2023. The building is finished and very likely open.
Play Street Museum is located at 5601 Brodie Lane, Suite 940, Sunset Valley, TX, 78745, in Travis County.
RREEF AMERICA REIT II PORTFOLIO LP is the property owner/developer of record for Play Street Museum, per its TDLR project registration.
Thorn Design is the design firm of record for Play Street Museum, according to its TDLR filing.
Play Street Museum has an estimated construction value of $150K and approximately 2,691 square feet (about $56/sqft), based on its TDLR filing.
Interior Renovation Only
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 18, 2022
Review Complete
Inspection Complete
Closed
Feb 28, 2023
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work *JILL KISSINGER: Remove existing vertical furnace and outdoor unit and install new like-for-like Goodman HVAC system; no structural change.
AISD Bond 2022 modernization of Fine Arts and Athletics program spaces. Renovation of Music studios Dance Arts 2D and 3D Art. Renovation of Athletics Trainers Room.
AISD Bond 2022 modernization of Fine Arts and Athletics program spaces. Renovation of Music studios Dance Arts 2D and 3D Art. Renovation of Athletics Trainers Room.
AISD Bond 2022 modernization of Fine Arts and Athletics program spaces. Renovation of Music studios Dance Arts 2D and 3D Art. Renovation of Athletics Trainers Room.
AISD Bond 2022 modernization of Fine Arts and Athletics program spaces. Renovation of Music studios Dance Arts 2D and 3D Art. Renovation of Athletics Trainers Room.