Band Hall Renovation and Additions in Lyford, TX
8201 High School Cir., Lyford, TX, 78569
Band Hall Renovation and Additions is a additions to existing building project at 8201 High School Cir., Lyford, in Willacy County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2023). The project has an estimated value of $2.8M across about 9,117 sq ft.
- Estimated project value
- $2.8M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 9,117 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $307/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 8 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
41 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
237 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78569 (Lyford)
One email per change. Unsubscribe in one click. Privacy.
Band Hall Renovation and Additions is a Additions to Existing Building project located at 8201 High School Cir., Lyford, TX 78569 in Lyford, Texas. The project has an estimated value of $2.8M covering 9,117 sq ft. Lyford Consolidated Independent School District is the property owner and ADM Group Inc. is the design firm of record. The project was registered with TDLR on November 30, 2022.
Frequently Asked Questions
What is Band Hall Renovation and Additions?
Band Hall Renovation and Additions is a additions to existing building project at 8201 High School Cir. in Lyford, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing building and new construction - work includes demolition, new bearing an non-bearing partitions, new ceilings, lighting, finishes, electrical, and plumbing. Modifications to mechanical and fire alarm.
Is Band Hall Renovation and Additions open in Lyford?
Construction on Band Hall Renovation and Additions is complete — TDLR records show the project passed its required accessibility inspection in Sep 2023. The building is finished and very likely open.
Where is Band Hall Renovation and Additions located?
Band Hall Renovation and Additions is located at 8201 High School Cir., Lyford, TX, 78569, in Willacy County.
Who is the owner or developer of Band Hall Renovation and Additions?
Lyford Consolidated Independent School District is the property owner/developer of record for Band Hall Renovation and Additions, per its TDLR project registration.
Who is the architect or design firm for Band Hall Renovation and Additions?
ADM Group Inc. is the design firm of record for Band Hall Renovation and Additions, according to its TDLR filing.
How much does Band Hall Renovation and Additions cost and how big is it?
Band Hall Renovation and Additions has an estimated construction value of $2.8M and approximately 9,117 square feet (about $307/sqft), based on its TDLR filing.
Scope of Work
Renovation of existing building and new construction - work includes demolition, new bearing an non-bearing partitions, new ceilings, lighting, finishes, electrical, and plumbing. Modifications to mechanical and fire alarm.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
8201 High School Cir., Lyford, TX, 78569
Related Projects
Same Owner
$23.1M totalNearby Projects
Within 0.6 miWatch all construction in 78569 (Lyford)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Lyford?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.