Exterior Stair Addition
Exterior Stair Addition is a additions to existing building project at 3423 Bee Cave Rd. Building A, West Lake Hills, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2023). The project has an estimated value of $70K across about 514 sq ft.
๐Project Metrics
TDLR #TABS2023007042Project Closed
Project has been completed and closed
Exterior Stair Addition is a Additions to Existing Building project located at 3423 Bee Cave Rd. Building A, West Lake Hills, TX 78746 in West Lake Hills, Texas. The project has an estimated value of $70K covering 514 sq ft. TOPO is the property owner. The project was registered with TDLR on December 8, 2022.
โFrequently Asked Questions
What is Exterior Stair Addition?
Exterior Stair Addition is a additions to existing building project at 3423 Bee Cave Rd. Building A in West Lake Hills, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A new exterior stair is being added to the existing Building A
Is Exterior Stair Addition open in West Lake Hills?
Construction on Exterior Stair Addition is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2023. The building is finished and very likely open.
Where is Exterior Stair Addition located?
Exterior Stair Addition is located at 3423 Bee Cave Rd. Building A, West Lake Hills, TX, 78746, in Travis County.
Who is the owner or developer of Exterior Stair Addition?
TOPO is the property owner/developer of record for Exterior Stair Addition, per its TDLR project registration.
How much does Exterior Stair Addition cost and how big is it?
Exterior Stair Addition has an estimated construction value of $70K and approximately 514 square feet (about $136/sqft), based on its TDLR filing.
๐Scope of Work
A new exterior stair is being added to the existing Building A
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 8, 2022
Review Complete
Inspection Complete
Closed
Apr 19, 2023
๐Related Projects
๐คSame Owner
$1.8M total๐Related City Permits
Building permits found at or near this location
83.08kwDC Roof mounted PV (Westlake Full Purpose)
ETJ new service for commercial building
Temporary Power For Smiles Jobsite
Express: Replace floors Baseboards handrail and fixtures throughout.
REPLACE 5 RAG RISERS WITH NEW WEATHER HEAD AND MAST REPLACE EXISTING METERS WITH AUSTIN ENERGY APPROVED METER BASES WITH DISCONNECT REPLACE EXISTING MAIN PANELS WITH 100 AMP MAIN DISCONNECTS