EnergyX
EnergyX is a renovation/alteration project at 2535 Ridgepoint dr, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2023). The project has an estimated value of $5.0M across about 40,000 sq ft.
๐Project Metrics
TDLR #TABS2023008149Project Closed
Project has been completed and closed
EnergyX is a Renovation/Alteration project located at 2535 Ridgepoint dr, Austin, TX 78754 in Austin, Texas. The project has an estimated value of $5.0M covering 40,000 sq ft. CushWake is the property owner and PDR is the design firm of record. The project was registered with TDLR on December 21, 2022.
โFrequently Asked Questions
What is EnergyX?
EnergyX is a renovation/alteration project at 2535 Ridgepoint dr in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New partitions, fixtures, finishes, and new mezzanine.
Is EnergyX open in Austin?
Construction on EnergyX is complete โ TDLR records show the project passed its required accessibility inspection in May 2023. The building is finished and very likely open.
Where is EnergyX located?
EnergyX is located at 2535 Ridgepoint dr, Austin, TX, 78754, in Travis County.
Who is the owner or developer of EnergyX?
CushWake is the property owner/developer of record for EnergyX, per its TDLR project registration.
Who is the architect or design firm for EnergyX?
PDR is the design firm of record for EnergyX, according to its TDLR filing.
How much does EnergyX cost and how big is it?
EnergyX has an estimated construction value of $5.0M and approximately 40,000 square feet (about $125/sqft), based on its TDLR filing.
๐Scope of Work
New partitions, fixtures, finishes, and new mezzanine.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 21, 2022
Review Complete
Inspection Complete
Closed
May 1, 2023
๐Related Projects
๐คSame Owner
$8.0M total๐Related City Permits
Building permits found at or near this location
ePlan: Commercial Expedited Review - Interior Remodel to Existing Energy X Office Building (2575 SF)
ePlan: Commercial Expedited Review - Remodel for Energy X -Phase 2. (36000 SF) MSB1 and MSB2
ePlan: Commercial Expedited Review - Remodel for Energy X -Phase 2. (36000 SF)
ePlan: Commercial Expedited Review - Remodel for Energy X -Phase 2. (36000 SF)
ePlan: Commercial Expedited Review - Remodel for Energy X -Phase 2. (36000 SF)