Project intelligenceTDLR TABS2023008423Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

CITY OF STANTON TXCDBG WATER IMPROVEMENTS

N. Florence Street & Bell Street, Stanton, TX, 79782

Construction complete · Aug 2023Project Closed

CITY OF STANTON TXCDBG WATER IMPROVEMENTS is a renovation/alteration project at N. Florence Street & Bell Street, Stanton, in Martin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2023). The project has an estimated value of $319K across about 1,500 sq ft.

Estimated project value
$319K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$212/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 28, 2022246 days across supplied datesAug 31, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    63 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    183 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79782 (Stanton)

One email per change. Unsubscribe in one click. Privacy.

CITY OF STANTON TXCDBG WATER IMPROVEMENTS is a Renovation/Alteration project located at N. Florence Street & Bell Street, Stanton, TX 79782 in Stanton, Texas. The project has an estimated value of $319K covering 1,500 sq ft. City of Stanton is the property owner and Parkhill is the design firm of record. The project was registered with TDLR on December 28, 2022.

Frequently Asked Questions

What is CITY OF STANTON TXCDBG WATER IMPROVEMENTS?

CITY OF STANTON TXCDBG WATER IMPROVEMENTS is a renovation/alteration project at N. Florence Street & Bell Street in Stanton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Approximately 970 lf of new water line installation, public sidewalk and driveway repair/replacement.

Is CITY OF STANTON TXCDBG WATER IMPROVEMENTS open in Stanton?

Construction on CITY OF STANTON TXCDBG WATER IMPROVEMENTS is complete — TDLR records show the project passed its required accessibility inspection in Aug 2023. The building is finished and very likely open.

Where is CITY OF STANTON TXCDBG WATER IMPROVEMENTS located?

CITY OF STANTON TXCDBG WATER IMPROVEMENTS is located at N. Florence Street & Bell Street, Stanton, TX, 79782, in Martin County.

Who is the owner or developer of CITY OF STANTON TXCDBG WATER IMPROVEMENTS?

City of Stanton is the property owner/developer of record for CITY OF STANTON TXCDBG WATER IMPROVEMENTS, per its TDLR project registration.

Who is the architect or design firm for CITY OF STANTON TXCDBG WATER IMPROVEMENTS?

Parkhill is the design firm of record for CITY OF STANTON TXCDBG WATER IMPROVEMENTS, according to its TDLR filing.

How much does CITY OF STANTON TXCDBG WATER IMPROVEMENTS cost and how big is it?

CITY OF STANTON TXCDBG WATER IMPROVEMENTS has an estimated construction value of $319K and approximately 1,500 square feet (about $212/sqft), based on its TDLR filing.

Scope of Work

Approximately 970 lf of new water line installation, public sidewalk and driveway repair/replacement.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

N. Florence Street & Bell Street, Stanton, TX, 79782

32.12679, -101.78136

Watch all construction in 79782 (Stanton)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.