Retreat Center
Retreat Center is a renovation/alteration project at 100 N. Blackburn, Brady, in McCulloch County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2023). The project has an estimated value of $400K across about 3,800 sq ft.
๐Project Metrics
TDLR #TABS2023008693Project Closed
Project has been completed and closed
Retreat Center is a Renovation/Alteration project located at 100 N. Blackburn, Brady, TX 76825 in Brady, Texas. The project has an estimated value of $400K covering 3,800 sq ft. Joanne Heady is the property owner and Architexas is the design firm of record. The project was registered with TDLR on January 4, 2023.
โFrequently Asked Questions
What is Retreat Center?
Retreat Center is a renovation/alteration project at 100 N. Blackburn in Brady, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New roof support, level floors, add new walls, ceilings. Add new plumbing, electrical and HAVC to the second floor. Redo old stairs, replace freight elevator with new passenger elevator.
Is Retreat Center open in Brady?
Construction on Retreat Center is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2023. The building is finished and very likely open.
Where is Retreat Center located?
Retreat Center is located at 100 N. Blackburn, Brady, TX, 76825, in McCulloch County.
Who is the owner or developer of Retreat Center?
Joanne Heady is the property owner/developer of record for Retreat Center, per its TDLR project registration.
Who is the architect or design firm for Retreat Center?
Architexas is the design firm of record for Retreat Center, according to its TDLR filing.
How much does Retreat Center cost and how big is it?
Retreat Center has an estimated construction value of $400K and approximately 3,800 square feet (about $105/sqft), based on its TDLR filing.
๐Scope of Work
New roof support, level floors, add new walls, ceilings. Add new plumbing, electrical and HAVC to the second floor. Redo old stairs, replace freight elevator with new passenger elevator.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 4, 2023
Review Complete
Inspection Complete
Closed
Sep 1, 2023